Quick answers
What is this project?
Project for manufacturing of Intermediates & Finished products for Epoxy & PU coating at Plot No.: 1D/2, A/P-Shirwal, Taluka Khandala, Dist. Satara, Maharashtra by Pidilite Industries Limited is an approved industrial project in Moh Tarf Shirwal, Khandala, Satara, Maharashtra. The site covers 3.9 acres.
Who is building it?
The applicant is Pidilite Industries Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Apr 2023), as of 27 Nov 2026.
Where is it?
In Moh Tarf Shirwal, Khandala, Satara, Maharashtra.
How big is it?
It has a stated cost of ₹45.2 crore and a site of 3.9 acres.
When was it filed?
The application was filed on 26 Apr 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Apr 2023 |
| Application filed | 26 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Pidilite Industries Limited |
| Land area | 3.9 acres (1.6 ha) |
| Project cost | ₹45.2 crore |
| Village / locality | Moh Tarf Shirwal |
| Taluk / tehsil | Khandala |
| District | Satara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03249 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 | Cleared for impact study | 3.9 acres | ₹45.2 crore |
| New project filed 26 Apr 2023 (this page) | Environmental approval granted | 3.9 acres | ₹45.2 crore |
In context
36 applications in Satara since January 2022 are in the same category (Industry): 23 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.9 acres, this one is smaller than 86% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Moh Tarf Shirwal, Khandala, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for manufacturing of Intermediates & Finished products for Epoxy & PU… — cleared for impact study, 0 m away
- Proposed expansion for manufacturing of 20000 TPA Flex Pack Adhesives &… — cleared for impact study, 100 m away
- Environmental Clearance for Industrial shed project located at Gat No.… — environmental approval granted, 250 m away
- Proposed Expansion Industrial Shed Construction Project located at Gut No.… — environmental approval granted, 1.2 km away
- Diversion of Forest Land for Laying Underground 22 KV Transmission Line for… — in-principle approval, conditions pending, 2 km away
- Diversion of Forest for Laying Underground Rising Main 880 Mm. Dia M. S. Type… — in-principle approval, conditions pending, 2.1 km away
- Proposed Project at Shindewadi, Satara by M/s Volex Interconnect India Pvt Ltd — environmental approval granted, 2.5 km away
- Environmental Clearance for factory building located at Plot No I-45/A,at… — environmental approval granted, 5.3 km away
All 14 Pidilite Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.