Quick answers
What is this project?
Proposed expansion for manufacturing of 20000 TPA Flex Pack Adhesives & (Earlier 20000 TPA Engineering Adhesives; 16500 TPA Pressure Sensitive Adhesive Hygiene; 7200 TPA Hot Melt Adhesive; 7200 TPA Water based adhesive; 750 TPA Relabeling and Repacking of Adhesives) by M/s. H. B. Fuller India Adhesives Pvt. Ltd. at Plot No. 1E; Sr. No 1129, 1140, 1295, 1296, 1122, 1134, 1137 & 1138; Mauje - Shirwal, Tal-Khandala, Dist.-Satara, Maharashtra – 412801 over an area 3.387 ha is a proposed industrial project in Moh Tarf Shirwal, Khandala, Satara, Maharashtra. The site covers 10.3 acres.
Who is building it?
The applicant is H B Fuller India Adhesives Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 25 Jun 2026), as of 27 Nov 2026.
Where is it?
In Moh Tarf Shirwal, Khandala, Satara, Maharashtra.
How big is it?
It has a stated cost of ₹42.5 crore and a site of 10.3 acres.
When was it filed?
The application was filed on 20 Jun 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Jun 2026 |
| Application filed | 20 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | H B Fuller India Adhesives Private Limited |
| Land area | 10.3 acres (4.2 ha) |
| Project cost | ₹42.5 crore |
| Village / locality | Moh Tarf Shirwal |
| Taluk / tehsil | Khandala |
| District | Satara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11533 |
In context
36 applications in Satara since January 2022 are in the same category (Industry): 23 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10.3 acres, this one is smaller than 67% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Moh Tarf Shirwal, Khandala, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for manufacturing of Intermediates & Finished products for Epoxy & PU… — cleared for impact study, 100 m away
- Project for manufacturing of Intermediates & Finished products for Epoxy & PU… — environmental approval granted, 100 m away
- Environmental Clearance for Industrial shed project located at Gat No.… — environmental approval granted, 300 m away
- Proposed Expansion Industrial Shed Construction Project located at Gut No.… — environmental approval granted, 1.1 km away
- Diversion of Forest for Laying Underground Rising Main 880 Mm. Dia M. S. Type… — in-principle approval, conditions pending, 2.1 km away
- Diversion of Forest Land for Laying Underground 22 KV Transmission Line for… — in-principle approval, conditions pending, 2.1 km away
- Proposed Project at Shindewadi, Satara by M/s Volex Interconnect India Pvt Ltd — environmental approval granted, 2.6 km away
- Environmental Clearance for factory building located at Plot No I-45/A,at… — environmental approval granted, 5.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.