Quick answers
What is this project?
Environmental Clearance for Industrial shed project located at Gat No. 1122,1129,1140,1295,1296, Village Shirwal, Taluka Khandala, District – Satara-412801 by M/s. TE Connectivity India Private Limited is an approved industrial building project in Moh Tarf Shirwal, Khandala, Satara, Maharashtra. The site covers 25 acres.
Who is building it?
The applicant is Te Connectivity India Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Jul 2025), as of 27 Nov 2026.
Where is it?
In Moh Tarf Shirwal, Khandala, Satara, Maharashtra.
How big is it?
It has a stated cost of ₹485 crore and a site of 25 acres.
When was it filed?
The application was filed on 16 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Jul 2025 |
| Application filed | 16 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Te Connectivity India Private Limited |
| Use | Industrial |
| Land area | 25 acres (10.1 ha) |
| Built-up area | 202 m² (2,174 sq ft) |
| Plot area | 1,01,202 m² (10,89,328 sq ft) |
| Project cost | ₹485 crore |
| Village / locality | Moh Tarf Shirwal |
| Taluk / tehsil | Khandala |
| District | Satara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04768 |
In context
52 applications in Satara since January 2022 are in the same category (Buildings & townships): 20 approved, 23 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 25 acres, this one is larger than 52% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Moh Tarf Shirwal, Khandala, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for manufacturing of Intermediates & Finished products for Epoxy & PU… — cleared for impact study, 250 m away
- Project for manufacturing of Intermediates & Finished products for Epoxy & PU… — environmental approval granted, 250 m away
- Proposed expansion for manufacturing of 20000 TPA Flex Pack Adhesives &… — cleared for impact study, 300 m away
- Proposed Expansion Industrial Shed Construction Project located at Gut No.… — environmental approval granted, 1.3 km away
- Diversion of Forest Land for Laying Underground 22 KV Transmission Line for… — in-principle approval, conditions pending, 1.9 km away
- Diversion of Forest for Laying Underground Rising Main 880 Mm. Dia M. S. Type… — in-principle approval, conditions pending, 2 km away
- Proposed Project at Shindewadi, Satara by M/s Volex Interconnect India Pvt Ltd — environmental approval granted, 2.5 km away
- Environmental Clearance for factory building located at Plot No I-45/A,at… — environmental approval granted, 5.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.