Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Oct 2023 |
| Application filed | 19 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Public Works Department |
| Land area | 3.2 acres (1.3 ha) |
| Project cost | ₹50 crore |
| Village / locality | Na |
| Taluk / tehsil | Greater Mumbai |
| District | Mumbai |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03250 |
In context
583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.2 acres, this one is larger than 58% of them.
150 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Na, Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- PROPOSED REDEVELOPMENT OF EXISTING MLA HOSTEL "MANORA AAMDAR NIWAS" PROJECT ON… — more information requested, 0 m away
- Bridge Connecting Nariman Point to Colaba / Cuffe Parade, Mumbai, Maharashtra — coastal clearance granted, 350 m away
- Proposal CRZ Clearance for strengthening of existing anti Sea Erosion Bund and… — recommended by coastal authority, 450 m away
- New Mantralay Building on Bearing CTS no 1580 to 1583, 1587 to 1590, 1577 to… — lapsed, 500 m away
- Application for lift opening on terrace floor in A and B wing (1 lift each) at… — recommended by coastal authority, 650 m away
- Inland Water Transport Terminal-Development of Marina" at Cuffe Parade Mumbai,… — under coastal review, 700 m away
- Proposed Protection Works for Fishermen Houses near Shivshastri Nagar at Cuffe… — recommended by coastal authority, 700 m away
- Proposed Internal Additions/Alterations, Interior Work and Change of User From… — recommended by coastal authority, 850 m away
More from Public Works Department in Mumbai
- Application for CRZ Clearance under CRZ Notification, 2019 for our proposed… — recommended by coastal authority
- Proposed Strengthening and Widening of existing Fish Drying Platform & Sloping… — recommended by coastal authority
- Proposed anti sea erosion bund, retaining wall & strengthening of existing… — under coastal review
- Proposal CRZ Clearance for strengthening of existing anti Sea Erosion Bund and… — recommended by coastal authority
- New Mantralay Building on Bearing CTS no 1580 to 1583, 1587 to 1590, 1577 to… — lapsed
- Expansion of proposed redevelopment of Metropolitan Magistrate Court and City… — environmental approval granted
34 Public Works Department, Maharashtra projects in Mumbai
All 155 Public Works Department, Maharashtra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.