Project details
| Official title | Proposed Construction of Bridge Connecting Nariman Point to Colaba / Cuffe Parade, Mumbai, Maharashtra |
|---|---|
| Status | Coastal clearance granted |
| Status since | 11 Nov 2026 |
| Application filed | 13 Jul 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Shekhar Bhadane |
| Land area | 1,800 m² |
| Project cost | ₹588.4 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Greater Mumbai |
| District | Mumbai |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17169 |
In context
16 applications in Mumbai since January 2022 are in the same category (Roads & highways): 12 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.4 acres, this one is smaller than 62% of them.
142 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- PROPOSED REDEVELOPMENT OF EXISTING MLA HOSTEL "MANORA AAMDAR NIWAS" PROJECT ON… — environmental approval granted, 350 m away
- PROPOSED REDEVELOPMENT OF EXISTING MLA HOSTEL "MANORA AAMDAR NIWAS" PROJECT ON… — more information requested, 350 m away
- Proposal CRZ Clearance for strengthening of existing anti Sea Erosion Bund and… — recommended by coastal authority, 350 m away
- Inland Water Transport Terminal-Development of Marina" at Cuffe Parade Mumbai,… — under coastal review, 450 m away
- Proposed Protection Works for Fishermen Houses near Shivshastri Nagar at Cuffe… — recommended by coastal authority, 500 m away
- Application for lift opening on terrace floor in A and B wing (1 lift each) at… — recommended by coastal authority, 500 m away
- New Mantralay Building on Bearing CTS no 1580 to 1583, 1587 to 1590, 1577 to… — lapsed, 750 m away
- Proposed Internal Additions/Alterations, Interior Work and Change of User From… — recommended by coastal authority, 850 m away
More from Shekhar Bhadane in Mumbai
- Promenade at Marine Drive in Mumbai, Maharashtra — coastal clearance granted
- Proposed underground road connectivity from Eastern Freeway-Orange Gate to… — coastal clearance granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.