Project details
| Official title | Proposed construction of New Mantralay Building on Bearing CTS no 1580 to 1583, 1587 to 1590, 1577 to 1586 Mantralaya, Churchgate, Mumbai, Maharashtra 400020 by The Executive Engineer, Presidency Division, PWD, Maharashtra |
|---|---|
| Status | Lapsed |
| Status since | 22 Mar 2026 |
| Application filed | 21 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Public Works Department |
| Land area | 6.8 acres (2.7 ha) |
| Project cost | ₹118.2 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Greater Mumbai |
| District | Mumbai |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-09082 |
In context
583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.8 acres, this one is larger than 77% of them.
173 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- PROPOSED REDEVELOPMENT OF EXISTING MLA HOSTEL "MANORA AAMDAR NIWAS" PROJECT ON… — environmental approval granted, 500 m away
- PROPOSED REDEVELOPMENT OF EXISTING MLA HOSTEL "MANORA AAMDAR NIWAS" PROJECT ON… — more information requested, 500 m away
- Proposed redevelopment of existing demolished building known as Cama Chambers,… — recommended by coastal authority, 700 m away
- CRZ Clearance for Amended plans for the existing Bombay Stock Exchange… — recommended by coastal authority, 750 m away
- Application for lift opening on terrace floor in A and B wing (1 lift each) at… — recommended by coastal authority, 750 m away
- Bridge Connecting Nariman Point to Colaba / Cuffe Parade, Mumbai, Maharashtra — coastal clearance granted, 750 m away
- Inland Water Transport Terminal-Development of Marina" at Cuffe Parade Mumbai,… — under coastal review, 900 m away
- Proposal CRZ Clearance for strengthening of existing anti Sea Erosion Bund and… — recommended by coastal authority, 950 m away
More from Public Works Department in Mumbai
- Application for CRZ Clearance under CRZ Notification, 2019 for our proposed… — recommended by coastal authority
- Proposed Strengthening and Widening of existing Fish Drying Platform & Sloping… — recommended by coastal authority
- Proposed anti sea erosion bund, retaining wall & strengthening of existing… — under coastal review
- Proposal CRZ Clearance for strengthening of existing anti Sea Erosion Bund and… — recommended by coastal authority
- Expansion of proposed redevelopment of Metropolitan Magistrate Court and City… — environmental approval granted
- Strengthening of existing anti-sea erosion bund along the High Tide Line (HTL)… — recommended by coastal authority
34 Public Works Department, Maharashtra projects in Mumbai
All 155 Public Works Department, Maharashtra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.