What is Developing? Open the mapMap

Cleared for impact studyIndustry · Dhule, Maharashtra

Proposed Green Field Synthetic Organic Chemicals Manufacturing Plant at Plot no. T-31, MIDC, Nardana Industrial Area Phase II, Village Babhale, Sub-District Shindkheda, District Dhule, State Maharashtra

Proposed Green Field Synthetic Organic Chemicals Manufacturing Plant at Plot no. T-31, MIDC, Nardana Industrial Area Phase II, Village Babhale, Sub-District Shindkheda, District Dhule, State Maharashtra is a proposed industrial project in Babhalde, Sindkhede, Dhule, Maharashtra. The site covers 3.1 acres. Its stated project cost is ₹40 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 11 Jan 2025).

See it on the live map All projects in Dhule

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Green Field Synthetic Organic Chemicals Manufacturing Plant at Plot no. T-31, MIDC, Nardana Industrial Area Phase II, Village Babhale, Sub-District Shindkheda, District Dhule, State Maharashtra is a proposed industrial project in Babhalde, Sindkhede, Dhule, Maharashtra. The site covers 3.1 acres.

Who is building it?

The applicant is Unified Amines Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 11 Jan 2025), as of 27 Nov 2026.

Where is it?

In Babhalde, Sindkhede, Dhule, Maharashtra.

How big is it?

It has a stated cost of ₹40 crore and a site of 3.1 acres.

When was it filed?

The application was filed on 29 Sept 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Green Field Synthetic Organic Chemicals Manufacturing Plant at Plot no. T-31,…

Project details

StatusCleared for impact study
Status since11 Jan 2025
Application filed29 Sept 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantUnified Amines Private Limited
Land area3.1 acres (1.3 ha)
Project cost₹40 crore
Village / localityBabhalde
Taluk / tehsilSindkhede
DistrictDhule
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-03678

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 25 Aug 2025Environmental approval granted3.1 acres₹40 crore
Early planning filed 29 Sept 2024 (this page)Cleared for impact study3.1 acres₹40 crore

In context

31 applications in Dhule since January 2022 are in the same category (Industry): 19 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.1 acres, this one is smaller than 87% of them.

19 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Babhalde, Sindkhede, Dhule, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.