Proposed 40 MW AFBC based Captive Power Plant by M/s ISMT Limited is a proposed power project in Kurla, Warora, Chandrapur, Maharashtra. The site covers 60 acres.
Who is building it?
The applicant is Omsairam Steels and Alloys PVT LTD.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kurla, Warora, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹17 lakh and a site of 60 acres.
When was it filed?
The application was filed on 11 Jul 2024.
Project details
| Official title | Proposed 40 MW AFBC based Captive Power Plant at Kurla Village, Warora Tehsil, Chandrapur District by M/s ISMT Limited |
|---|---|
| Status | More information requested |
| Status since | 14 Nov 2026 |
| Application filed | 11 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Omsairam Steels and Alloys PVT LTD |
| Land area | 60 acres (24.3 ha) |
| Project cost | ₹17 lakh |
| Village / locality | Kurla |
| Taluk / tehsil | Warora |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03768 |
In context
10 applications in Chandrapur since January 2022 are in the same category (Power): 1 approved, 7 filed or under review, and 2 withdrawn, lapsed or rejected. At 60 acres, this one is smaller than 90% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kurla, Warora, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing 40 MW AFBC based CPP to Integrated Steel Plant with Iron… — lapsed, 300 m away
- Environmental Clearance Proposed Pohni Sand Ghat, Area 1.20 ha, Gut. no.… — environmental approval granted, 6.6 km away
- Greenfield Project comprising of establishment of Pellet Plant (12,00,000… — environmental approval granted, 6.7 km away
- Greenfield Project comprising of establishment of Pellet Plant (12,00,000… — cleared for impact study, 6.7 km away
- Environmental Clearance Proposed Pohni- Yvti Sand Ghat, Area 2.45 ha, Gut. no.… — environmental approval granted, 6.9 km away
- 4G Saturation BSNL- Village WANDHALI Tal WARORA Land for the Tower — lapsed, 7.8 km away
- Stone Quarry (M L Area 1.90 ha, Out of 2.59ha) — environmental approval granted, 8.3 km away
- Minor Mineral Lease Loangadga Stone Quarry Mining Project — environmental approval granted, 8.4 km away