4G Saturation BSNL- Village WANDHALI Tal WARORA Land for the Tower is a lapsed building project in Wandhali, Warora, Chandrapur, Maharashtra. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Wandhali, Warora, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹65 lakh; a site of 0 acres and 180 m² of forest land.
When was it filed?
The application was filed on 27 Dec 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 27 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 180 m² |
| Project cost | ₹65 lakh |
| Village / locality | Wandhali |
| Taluk / tehsil | Warora |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16102 |
In context
26 applications in Chandrapur since January 2022 are in the same category (Buildings & townships): 1 approved, 17 filed or under review, and 8 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Wandhali, Warora, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Stone Quarry (M L Area 1.90 ha, Out of 2.59ha) — environmental approval granted, 1.7 km away
- Proposed Minor Mineral Lease for murom & Stone quarry of Area 1.01 Hectare,… — environmental approval granted, 1.8 km away
- Minor Mineral Lease Loangadga Stone Quarry Mining Project — environmental approval granted, 1.9 km away
- Sushant Mahadev Mane — withdrawn, 3 km away
- Wardha-Ballarshah 3rd Railway Line — in-principle approval, conditions pending, 7.7 km away
- Greenfield Project comprising of establishment of Pellet Plant (12,00,000… — environmental approval granted, 7.8 km away
- Greenfield Project comprising of establishment of Pellet Plant (12,00,000… — cleared for impact study, 7.8 km away
- Revalidation of prior EC of Bamrda Sand Ghat, Area 4.80 ha, Gut. no. 54, 55,… — environmental approval granted, 7.8 km away
More from Mahesh Nair in Chandrapur
- Diversion of 0.2Ha. Forest Land for installation of 4G Mobile Towers at 10… — more information requested
- Diversion of 0.66Ha. Forest Land for installation of 4G Mobile Towers for 4G… — lapsed
- Diversion of Land of area 0.018 ha — lapsed
- Diversion of Land of area 0.018 ha — lapsed
- 4G Saturation BSNL- Village Alphar alias Satara Tal WARORA Land for the Tower — lapsed
- 4G Saturation BSNL- Village BABAPUR Tal Jiwati Land for the Tower — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.