One of 3 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for Proposed S. R. Scheme U/ Reg. 33(10) Of DCPR 2034 On…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 2 Jan 2024 |
| Application filed | 2 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Merit Magnum Construction |
| Land area | 6.2 acres (2.5 ha) |
| Project cost | ₹520 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Greater Mumbai |
| District | Mumbai |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03840 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Jun 2024 | Environmental approval granted | 6.2 acres | ₹620 crore |
| Early planning filed 15 Jun 2024 | Cleared for impact study | 6.2 acres | ₹620 crore |
| Early planning filed 2 Jan 2024 (this page) | Cleared for impact study | 6.2 acres | ₹520 crore |
In context
583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.2 acres, this one is larger than 73% of them.
418 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Proposed Expansion in S. R. Scheme U/ Reg. 33(10)… — cleared for impact study, 0 m away
- Environmental Clearance for Proposed Expansion in S. R. Scheme U/ Reg. 33(10)… — cleared for impact study, 0 m away
- Environmental Clearance for Proposed S. R. Scheme U/ Reg. 33(10) Of DCPR 2034… — environmental approval granted, 0 m away
- Environmental Clearance for Proposed S. R. Scheme U/ Reg. 33(10) Of DCPR 2034… — cleared for impact study, 0 m away
- Expansion in Proposed SRA scheme project at C.S. Nos. 438(pt.), 597(pt.),… — environmental approval granted, 200 m away
- M/s Godrej Projects Development Ltd — under environmental review, 350 m away
- M/s Godrej Projects Development Ltd. — environmental approval granted, 400 m away
- M/s Godrej Projects Development Ltd. — cleared for impact study, 400 m away
More from Merit Magnum Construction in Mumbai
- Environmental Clearance for Proposed Expansion in S. R. Scheme U/ Reg. 33(10)… — cleared for impact study
- Environmental Clearance for Proposed Expansion in S. R. Scheme U/ Reg. 33(10)… — cleared for impact study
All 5 Merit Magnum Construction projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.