Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Dec 2025 |
| Application filed | 30 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Dignity Realty and Housing |
| Use | Residential |
| Height | 119 m |
| Land area | 2,400 m² |
| Built-up area | 32,020 m² (3,44,660 sq ft) |
| Project cost | ₹110 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Greater Mumbai |
| District | Mumbai |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-10596 |
In context
583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.6 acres, this one is smaller than 84% of them.
403 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Proposed Expansion in S. R. Scheme U/ Reg. 33(10)… — cleared for impact study, 200 m away
- Environmental Clearance for Proposed Expansion in S. R. Scheme U/ Reg. 33(10)… — cleared for impact study, 200 m away
- Environmental Clearance for Proposed S. R. Scheme U/ Reg. 33(10) Of DCPR 2034… — environmental approval granted, 200 m away
- Environmental Clearance for Proposed S. R. Scheme U/ Reg. 33(10) Of DCPR 2034… — cleared for impact study, 200 m away
- Environmental Clearance for Proposed S. R. Scheme U/ Reg. 33(10) Of DCPR 2034… — cleared for impact study, 200 m away
- M/s Godrej Projects Development Ltd — under environmental review, 450 m away
- M/s Godrej Projects Development Ltd. — environmental approval granted, 550 m away
- M/s Godrej Projects Development Ltd. — cleared for impact study, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.