What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Mumbai, Maharashtra

Environmental Clearance for Proposed Expansion in S. R. Scheme U/ Reg. 33(10) Of DCPR 2034 On Property Bearing Plot No. 10, Sewree- Wadala, Estate Scheme, No. 57 of Naigaon Division F/North Ward, Mumbai- 400031, For "Wadala Village Welfare CHS Ltd. By M/s. Merit Magnum Construction.

Environmental Clearance for Proposed Expansion in S. R. Scheme U/ Reg. 33(10) Of DCPR 2034 On Property Bearing Plot No. 10, Sewree- Wadala, Estate Scheme, No. 57 of Naigaon Division F/North Ward, Mumbai- 400031, For "Wadala Village Welfare CHS Ltd. By M/s. Merit Magnum Construction is a proposed residential project in Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The site covers 6.2 acres. Its stated project cost is ₹650.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 28 Oct 2025).

See it on the live map All projects in Mumbai

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since28 Oct 2025
Application filed13 Oct 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantMerit Magnum Construction
UseResidential
Land area6.2 acres (2.5 ha)
Built-up area3,68,740 m² (39,69,080 sq ft)
Project cost₹650.7 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilGreater Mumbai
DistrictMumbai
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-09031

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 13 Oct 2025 (this page)Cleared for impact study6.2 acres₹650.7 crore
Early planning filed 16 Sept 2025Cleared for impact study6.2 acres₹712.7 crore

In context

583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.2 acres, this one is larger than 73% of them.

419 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Merit Magnum Construction in Mumbai

All 5 Merit Magnum Construction projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.