What is this project?
Barva Stone Quarry Proposed Lease area 3.91 ha out of 4.91 ha, survey no. 169, Village Barva, Tehsil Warora, District Chandrapur is an approved mining project in Barvha, Warora, Chandrapur, Maharashtra. The site covers 32.9 acres.
Who is building it?
The applicant is Saurabh Khandre.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Oct 2025), as of 27 Nov 2026.
Where is it?
In Barvha, Warora, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹95 lakh and a site of 32.9 acres.
When was it filed?
The application was filed on 23 Nov 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Oct 2025 |
| Application filed | 23 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Saurabh Khandre |
| Land area | 32.9 acres (13.3 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Barvha |
| Taluk / tehsil | Warora |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04084 |
In context
341 applications in Chandrapur since January 2022 are in the same category (Mining): 280 approved, 28 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 32.9 acres, this one is larger than 73% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Barvha, Warora, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Fattapur Stone Quarry Mining Project. — environmental approval granted, 550 m away
- Fattapur Minor Mineral Lease for Stone Mining Project — environmental approval granted, 1 km away
- Stone & Murrum Quarry Project by Shri. Swapnil Eknath Patil — environmental approval granted, 1.4 km away
- Pimpalgaon Singru Stone Quarry Mining Project, Lease Area 1.05 Hectare Mauza:… — environmental approval granted, 2.4 km away
- Wardha-Ballarshah 3rd Railway Line — in-principle approval, conditions pending, 9.7 km away
- Proposed 40 MW AFBC based Captive Power Plant by M/s ISMT Limited — more information requested, 10.6 km away
- Expansion of existing 40 MW AFBC based CPP to Integrated Steel Plant with Iron… — lapsed, 10.7 km away
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area for Proposed Kondhala… — under forest review, 11.9 km away
About this information