What is Wardha-Ballarshah 3rd Railway Line?
Wardha-Ballarshah 3rd Railway Line is a proposed railway project in Dongargaon, Warora, Chandrapur, Maharashtra. The site covers 1 acre.
Who is building it?
The applicant is Dy Chief Engineer (Construction) Wardha.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Dongargaon, Warora, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹1,272.2 crore; a site of 1 acre and 2,900 m² of forest land.
When was it filed?
The application was filed on 19 May 2023.
Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 17 Aug 2024 |
| Application filed | 19 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Dy Chief Engineer (Construction) Wardha |
| Land area | 4,000 m² |
| Forest land | 2,900 m² |
| Project cost | ₹1,272.2 crore |
| Village / locality | Dongargaon |
| Taluk / tehsil | Warora |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16186 |
In context
5 applications in Chandrapur since January 2022 are in the same category (Railways & metro): 0 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dongargaon, Warora, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area for Proposed Kondhala… — under forest review, 3.7 km away
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area and Tree cutting permission… — not approved, 3.7 km away
- Kondhala Limestone Block" (105.0 ha.) with Limestone Capacity of 2.25 Million… — lapsed, 3.9 km away
- Kondhala Limestone Block" (105.0 ha.) with Limestone Capacity of 2.25 Million… — cleared for impact study, 3.9 km away
- Integrated Cement Plant with production capacity of Clinker: 1.5 Million TPA;… — environmental approval granted, 4.1 km away
- Integrated Cement Plant with production capacity of Clinker: 1.5 Million TPA;… — cleared for impact study, 4.1 km away
- Expansion by addition of 1x660 MW Domestic Coal based Thermal Power Plant… — under environmental review, 6 km away
- Minor Mineral Lease Loangadga Stone Quarry Mining Project — environmental approval granted, 6.1 km away
More from Dy Chief Engineer (Construction) Wardha in Chandrapur
- Babupeth – Sasti New Railway Line — more information requested
All 6 Dy Chief Engineer projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.