Quick answers
What is Tarali Pumping Storage Project (1500 MW)?
Tarali Pumping Storage Project (1500 MW) is an approved water and irrigation project in Nivade, Patan, Satara, Maharashtra. The site covers 372.5 acres.
Who is building it?
The applicant is Adani Green Energy Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Apr 2026), as of 27 Nov 2026.
Where is it?
In Nivade, Patan, Satara, Maharashtra.
How big is it?
It has a stated cost of ₹5,675 crore and a site of 372.5 acres.
When was it filed?
The application was filed on 10 Dec 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Tarali Pumping Storage Project (1500 MW)
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Apr 2026 |
| Application filed | 10 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Adani Green Energy Limited |
| Land area | 372.5 acres (150.7 ha) |
| Project cost | ₹5,675 crore |
| Village / locality | Nivade |
| Taluk / tehsil | Patan |
| District | Satara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04752 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 26 Jun 2025 | Environmental approval granted | 372.5 acres | ₹5,675 crore |
| New project filed 10 Dec 2024 (this page) | Environmental approval granted | 372.5 acres | ₹5,675 crore |
| Amendment filed 19 Sept 2023 | Cleared for impact study | 372.5 acres | ₹5,675 crore |
In context
13 applications in Satara since January 2022 are in the same category (Water & irrigation): 8 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 372.5 acres, this one is smaller than 69% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nivade, Patan, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tarali Pumping Storage Project (1500 MW) — environmental approval granted, 0 m away
- Tarali Pumping Storage Project (1500 MW) — withdrawn, 0 m away
- Tarali Pumping Storage Project (1500 MW) — cleared for impact study, 0 m away
- Tarali Pumped Storage Project with a capacity of 1500MW in Patan Taluka,… — withdrawn, 50 m away
- Proposed Tarali Pumped Storage Project (1500 MW), covering an area of 150.7400… — under wildlife review, 500 m away
- Tarali Pumping Storage Project (1500 MW) — under wildlife review, 500 m away
- Re-Diversion of Forest Land — more information requested, 2.2 km away
- Nivakane (Integrated) Pumped Storage Project — environmental approval granted, 4.2 km away
More from Adani Green Energy Limited in Satara
- Proposed Tarali Pumped Storage Project (1500 MW), covering an area of 150.7400… — under wildlife review
- Nivakane (Integrated) Pumped Storage Project — more information requested
- Nivakane (Integrated) Pumped Storage Project — environmental approval granted
- Nivakane Pumped Storage Project — more information requested
- Nivakane (Integrated) Pumped Storage Project — cleared for impact study
- Tarali Pumping Storage Project (1500 MW) — under wildlife review
13 Adani Green Energy projects in Satara
All 39 Adani Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.