Quick answers
What is this project?
Proposed Tarali Pumped Storage Project (1500 MW), covering an area of 150.7400 hectares of non-forest land, located in the villages of Nivade, Tondoshi and Kalambe, Taluka Patan, District Satara, Maharashtra, by M/s Adani Green Energy Limited is a proposed building project in Kalambe, Patan, Satara, Maharashtra. The site covers 372.5 acres.
Who is building it?
The applicant is Adani Green Energy Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Kalambe, Patan, Satara, Maharashtra.
How big is it?
It has a stated cost of ₹56.8 crore and a site of 372.5 acres.
When was it filed?
The application was filed on 5 Nov 2026.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 5 Nov 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Adani Green Energy Limited |
| Land area | 372.5 acres (150.7 ha) |
| Project cost | ₹56.8 crore |
| Village / locality | Kalambe |
| Taluk / tehsil | Patan |
| District | Satara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-18088 |
In context
52 applications in Satara since January 2022 are in the same category (Buildings & townships): 20 approved, 23 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 372.5 acres, this one is larger than 98% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalambe, Patan, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tarali Pumping Storage Project (1500 MW) — under wildlife review, 0 m away
- Tarali Pumped Storage Project with a capacity of 1500MW in Patan Taluka,… — withdrawn, 450 m away
- Tarali Pumping Storage Project (1500 MW) — environmental approval granted, 500 m away
- Tarali Pumping Storage Project (1500 MW) — environmental approval granted, 500 m away
- Tarali Pumping Storage Project (1500 MW) — withdrawn, 500 m away
- Tarali Pumping Storage Project (1500 MW) — cleared for impact study, 500 m away
- Re-Diversion of Forest Land — more information requested, 2.3 km away
- Nivakane (Integrated) Pumped Storage Project — environmental approval granted, 3.8 km away
More from Adani Green Energy Limited in Satara
- Nivakane (Integrated) Pumped Storage Project — more information requested
- Nivakane (Integrated) Pumped Storage Project — environmental approval granted
- Nivakane Pumped Storage Project — more information requested
- Nivakane (Integrated) Pumped Storage Project — cleared for impact study
- Tarali Pumping Storage Project (1500 MW) — environmental approval granted
- Tarali Pumping Storage Project (1500 MW) — under wildlife review
13 Adani Green Energy projects in Satara
All 39 Adani Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.