What is Developing? Open the mapMap

Cleared for impact studyIndustry · Parbhani, Maharashtra

Proposed Expansion of Sugar Plant from 3500 TCD to 10000 TCD & Cogeneration Power Plant from 15MW to 40MW at Kanadkhed, Tal. Purna, Dist. Parbhani by M/s. Baliraja Sakhar Karkhana Limited

Proposed Expansion of Sugar Plant from 3500 TCD to 10000 TCD & Cogeneration Power Plant from 15MW to 40MW at Kanadkhed, Tal. Purna, Dist. Parbhani by M/s. Baliraja Sakhar Karkhana Limited is a proposed industrial project in Kanad Kheda, Purna, Parbhani, Maharashtra. The site covers 72.6 acres. Its stated project cost is ₹373.6 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 16 Dec 2024).

See it on the live map All projects in Parbhani

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Sugar Plant from 3500 TCD to 10000 TCD & Cogeneration Power Plant from 15MW to 40MW at Kanadkhed, Tal. Purna, Dist. Parbhani by M/s. Baliraja Sakhar Karkhana Limited is a proposed industrial project in Kanad Kheda, Purna, Parbhani, Maharashtra. The site covers 72.6 acres.

Who is building it?

The applicant is Baliraja Sakhar Karkhana Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 16 Dec 2024), as of 27 Nov 2026.

Where is it?

In Kanad Kheda, Purna, Parbhani, Maharashtra.

How big is it?

It has a stated cost of ₹373.6 crore and a site of 72.6 acres.

When was it filed?

The application was filed on 22 Nov 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Sugar Plant from 3500 TCD to 10000 TCD & Cogeneration Power Plant…

Project details

StatusCleared for impact study
Status since16 Dec 2024
Application filed22 Nov 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantBaliraja Sakhar Karkhana Limited
Land area72.6 acres (29.4 ha)
Project cost₹373.6 crore
Village / localityKanad Kheda
Taluk / tehsilPurna
DistrictParbhani
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-05129

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 21 Jul 2025Environmental approval granted72.6 acres₹373.6 crore
Early planning filed 22 Nov 2024 (this page)Cleared for impact study72.6 acres₹373.6 crore

In context

12 applications in Parbhani since January 2022 are in the same category (Industry): 9 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 72.6 acres, this one is smaller than 58% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kanad Kheda, Purna, Parbhani, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.