Environmental approval grantedIndustry · Parbhani, Maharashtra

Proposed Expansion of Sugar Plant from 3500 TCD to 10000 TCD & Cogeneration Power Plant from 15MW to 40MW at Kanadkhed, Tal. Purna, Dist. Parbhani by M/s. Baliraja Sakhar Karkhana Limited

Proposed Expansion of Sugar Plant from 3500 TCD to 10000 TCD & Cogeneration Power Plant from 15MW to 40MW at Kanadkhed, Tal. Purna, Dist. Parbhani by M/s. Baliraja Sakhar Karkhana Limited is an approved industrial project in Kanad Kheda, Purna, Parbhani, Maharashtra. The site covers 72.6 acres. Its stated project cost is ₹373.6 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 12 Feb 2026).

See it on the live map All projects in Parbhani

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Sugar Plant from 3500 TCD to 10000 TCD & Cogeneration Power Plant from 15MW to 40MW at Kanadkhed, Tal. Purna, Dist. Parbhani by M/s. Baliraja Sakhar Karkhana Limited is an approved industrial project in Kanad Kheda, Purna, Parbhani, Maharashtra. The site covers 72.6 acres.

Who is building it?

The applicant is Baliraja Sakhar Karkhana Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 12 Feb 2026), as of 27 Nov 2026.

Where is it?

In Kanad Kheda, Purna, Parbhani, Maharashtra.

How big is it?

It has a stated cost of ₹373.6 crore and a site of 72.6 acres.

When was it filed?

The application was filed on 21 Jul 2025.

Project details

StatusEnvironmental approval granted
Status since12 Feb 2026
Application filed21 Jul 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantBaliraja Sakhar Karkhana Limited
Land area72.6 acres (29.4 ha)
Project cost₹373.6 crore
Village / localityKanad Kheda
Taluk / tehsilPurna
DistrictParbhani
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-10465

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 21 Jul 2025 (this page)Environmental approval granted72.6 acres₹373.6 crore
Early planning filed 22 Nov 2024Cleared for impact study72.6 acres₹373.6 crore

In context

12 applications in Parbhani since January 2022 are in the same category (Industry): 9 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 72.6 acres, this one is smaller than 58% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kanad Kheda, Purna, Parbhani, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.