Cleared for impact studyBuildings & townships · Aurangabad, Maharashtra

Proposed Electric Passenger Car Manufacturing Plant [120 JPH] at Sector 22, Plot No. 1, AURIC Bidkin Industrial Area, Village Banni Tanda & Bidkin, Tehsil Paithan, District Chhatrapati Sambhaji Nagar (Aurangabad), Maharashtra under Project Activity 8(b) "Township and Area Development Projects" by M/s. JSW Green Mobility Limited.

Proposed Electric Passenger Car Manufacturing Plant [120 JPH] at Sector 22, Plot No. 1, AURIC Bidkin Industrial Area, Village Banni Tanda & Bidkin, Tehsil Paithan, District Chhatrapati Sambhaji Nagar (Aurangabad), Maharashtra under Project Activity 8(b) "Township and Area Development Projects" by M/s. JSW Green Mobility Limited is a proposed industrial building project in Banni Tanda, Paithan, Aurangabad, Maharashtra. The site covers 546.2 acres. Its stated project cost is ₹20,000 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 4 Dec 2024).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Electric Passenger Car Manufacturing Plant [120 JPH] at Sector 22, Plot No. 1,…

Project details

StatusCleared for impact study
Status since4 Dec 2024
Application filed3 Dec 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantJsw Green Mobility Limited
UseIndustrial
Land area546.2 acres (221 ha)
Project cost₹20,000 crore
Village / localityBanni Tanda
Taluk / tehsilPaithan
DistrictAurangabad
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-05590

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 22 Aug 2025Environmental approval granted546.2 acres₹20,000 crore
New project filed 11 Jan 2025Environmental approval granted546.2 acres₹20,000 crore
Early planning filed 3 Dec 2024 (this page)Cleared for impact study546.2 acres₹20,000 crore

In context

91 applications in Aurangabad since January 2022 are in the same category (Buildings & townships): 52 approved, 18 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 546.2 acres, this one is larger than 91% of them.

28 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Banni Tanda, Paithan, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jsw Green Mobility Limited in Aurangabad

All 4 Jsw Green Mobility projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.