One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Electric Passenger Car Manufacturing Plant [120 JPH] at Sector 22, Plot No. 1,…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Jan 2026 |
| Application filed | 22 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Jsw Green Mobility Limited |
| Use | Industrial |
| Land area | 546.2 acres (221 ha) |
| Built-up area | 6,15,504 m² (66,25,224 sq ft) |
| Plot area | 22,10,302 m² (2,37,91,470 sq ft) |
| Project cost | ₹20,000 crore |
| Village / locality | Banni Tanda |
| Taluk / tehsil | Paithan |
| District | Aurangabad |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-10554 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 22 Aug 2025 (this page) | Environmental approval granted | 546.2 acres | ₹20,000 crore |
| New project filed 11 Jan 2025 | Environmental approval granted | 546.2 acres | ₹20,000 crore |
| Early planning filed 3 Dec 2024 | Cleared for impact study | 546.2 acres | ₹20,000 crore |
In context
91 applications in Aurangabad since January 2022 are in the same category (Buildings & townships): 52 approved, 18 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 546.2 acres, this one is larger than 91% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Banni Tanda, Paithan, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of EC vide letter no.SIA/MH/INFRA2/517793/2025 dt. 14.07.2025,… — environmental approval granted, 0 m away
- Proposed Electric Passenger Car Manufacturing Plant [120 JPH] at Sector 22,… — environmental approval granted, 0 m away
- Proposed Electric Passenger Car Manufacturing Plant [120 JPH] at Sector 22,… — cleared for impact study, 0 m away
- Factory Building on Plot No. 60, Sector No. 14, AURIC Bidkin, T.Q. Paithan,… — environmental approval granted, 850 m away
- Mega Industrial Park in Bidkin, Maharashtra — environmental approval granted, 950 m away
- Mega Industrial Park in Bidkin, Maharashtra — environmental approval granted, 950 m away
- Synthetic Organic Chemicals manufacturing facility by Lubrizol India Pvt.… — cleared for impact study, 1.3 km away
- Proposed Expansion in Commercial Electric Vehicle Manufacturing plant… — environmental approval granted, 1.3 km away
More from Jsw Green Mobility Limited in Aurangabad
All 4 Jsw Green Mobility projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.