Project details
| Official title | Proposed Establishment of Synthetic Organic Chemicals manufacturing facility by Lubrizol India Pvt. Ltd., Plot No. 4, Sector 25, Bidkin Industrial area, Taluka: Paithan, Dist: Chhatrapati Sambhajinagar, Maharashtra |
|---|---|
| Status | Cleared for impact study |
| Status since | 24 Sept 2025 |
| Application filed | 12 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Lubrizol India Private Limited |
| Land area | 120 acres (48.6 ha) |
| Project cost | ₹1,873 crore |
| Village / locality | Bidkin |
| Taluk / tehsil | Paithan |
| District | Aurangabad |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-07648 |
In context
50 applications in Aurangabad since January 2022 are in the same category (Industry): 34 approved, 11 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 120 acres, this one is larger than 80% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bidkin, Paithan, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Industrial Building Project at Plot No. 4/3 Sector 25 , Auric,… — initial checks, 250 m away
- Proposed Industrial Unit at Plot No. 28, Auric, Bidkin, Sector-25, District… — more information requested, 450 m away
- Proposed Manufacturing of Speciality Polymers at Plot no. 3, Sector 25, AURIC… — cleared for impact study, 500 m away
- Transfer of EC vide letter no.SIA/MH/INFRA2/517793/2025 dt. 14.07.2025,… — environmental approval granted, 1.3 km away
- Proposed Electric Passenger Car Manufacturing Plant [120 JPH] at Sector 22,… — environmental approval granted, 1.3 km away
- Proposed Electric Passenger Car Manufacturing Plant [120 JPH] at Sector 22,… — environmental approval granted, 1.3 km away
- Proposed Electric Passenger Car Manufacturing Plant [120 JPH] at Sector 22,… — cleared for impact study, 1.3 km away
- Mega Industrial Park in Bidkin, Maharashtra — environmental approval granted, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.