What is this project?
Application for Corrigendum in revalidation letter of earlier EC for Stone Quarry Project of Shri Irfan A. Rashid Nazir is an approved mining project in Khanloshi, Mhasla, Raigarh, Maharashtra. The site covers 6.7 acres.
Who is building it?
The applicant is Irfan Ahmed Nazir.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Dec 2025), as of 27 Nov 2026.
Where is it?
In Khanloshi, Mhasla, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹70 lakh and a site of 6.7 acres.
When was it filed?
The application was filed on 31 Aug 2024.
Project details
| Official title | Application for Corrigendum in revalidation letter of earlier EC for Stone Quarry Project of Shri Irfan A. Rashid Nazir at Village- Khanloshi, Tal- Mhasala, Dist- Raigad. |
|---|---|
| Status | Environmental approval granted |
| Status since | 19 Dec 2025 |
| Application filed | 31 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Irfan Ahmed Nazir |
| Land area | 6.7 acres (2.7 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Khanloshi |
| Taluk / tehsil | Mhasla |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05832 |
In context
65 applications in Raigarh since January 2022 are in the same category (Mining): 50 approved, 3 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 6.7 acres, this one is smaller than 60% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Khanloshi, Mhasla, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to MMB Dighi Marine Shipyard Cluster: Shipbuilding and Repair Hub in Raigad, Maharashtra (7.7 km away).
Other projects nearby
- Two-Lane Bridge across Agardanda Creek with Approaches connecting Agardanda… — lapsed, 4.6 km away
- Diversion of Reserved Forest land on Gut No.76 & 78 of Village Rohini, Taluka… — lapsed, 4.9 km away
- Expansion of Existing Facility — lapsed, 5.2 km away
- Expansion of Existing Facility — recommended by coastal authority, 5.2 km away
- Expansion of Existing Facility — lapsed, 5.2 km away
- Proposed Expansion in Capacity of Kudgaon Harvit Bauxite Mine from 0.020 MTPA… — cleared for impact study, 5.5 km away
- Transfer of Environment Clearance of our Bauxite Mine Project — environmental approval granted, 5.5 km away
- Two-Lane Bridge across Agardanda Creek with Approaches connecting Agardanda… — lapsed, 6.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.