Quick answers
What is this project?
Two-Lane Bridge across Agardanda Creek with Approaches connecting Agardanda Tq. Murud and Dighi Tq. Shrivardhan is a lapsed road project in Sawali, Murud, Raigarh, Maharashtra. The site covers 2.4 acres.
Who is building it?
The applicant is Maharashtra State Road Development Corporation Limited.
Has it been approved?
No. The application was lapsed on 24 Jul 2025, so it is no longer under consideration.
Where is it?
In Sawali, Murud, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹1,235.2 crore; a site of 2.4 acres and 3.1 acres (1.3 ha) of forest land.
When was it filed?
The application was filed on 18 Mar 2024.
Project details
| Official title | Construction of Two-Lane Bridge across Agardanda Creek with Approaches connecting Agardanda Tq. Murud and Dighi Tq. Shrivardhan in Raigad District on Revas-Reddi Coastal Highway (MSH-04) in the State of Maharashtra on EPC Mode. (Construction Package-06 Agardanda Creek Bridge) |
|---|---|
| Status | Lapsed |
| Status since | 24 Jul 2025 |
| Application filed | 18 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Maharashtra State Road Development Corporation Limited |
| Land area | 2.4 acres (1 ha) |
| Forest land | 3.1 acres (1.3 ha) |
| Project cost | ₹1,235.2 crore |
| Village / locality | Sawali |
| Taluk / tehsil | Murud |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14860 |
In context
70 applications in Raigarh since January 2022 are in the same category (Roads & highways): 10 approved, 33 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 2.4 acres, this one is smaller than 60% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sawali, Murud, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to MMB Dighi Marine Shipyard Cluster: Shipbuilding and Repair Hub in Raigad, Maharashtra (5.1 km away); Dighi Port Expansion: 140 MMTPA Multi-Cargo Port in Raigad, Maharashtra (13.8 km away).
Other projects nearby
- Diversion of Reserved Forest land on Gut No.76 & 78 of Village Rohini, Taluka… — lapsed, 900 m away
- Expansion of Existing Facility — lapsed, 1.2 km away
- Expansion of Existing Facility — recommended by coastal authority, 1.2 km away
- Expansion of Existing Facility — lapsed, 1.2 km away
- Two-Lane Bridge across Agardanda Creek with Approaches connecting Agardanda… — lapsed, 1.5 km away
- CRZ issue regarding to CZMP prepared by the National Centre for Sustainable… — lapsed, 4.3 km away
- Application for Corrigendum in revalidation letter of earlier EC for Stone… — environmental approval granted, 4.6 km away
- Proposed Expansion in Capacity of Kudgaon Harvit Bauxite Mine from 0.020 MTPA… — cleared for impact study, 4.9 km away
More from Maharashtra State Road Development Corporation Limited in Raigarh
- Multimodal Corridor Project, from Navghar to Chirner by Maharashtra State Road… — more information requested
- Four Lane Bridge Across Dharamtar Creek with Approaches connecting Revas to… — under forest review
- Two-Lane Bridge across Agardanda Creek with Approaches connecting Agardanda… — lapsed
- Major Bridge Across Kundalika Creek Between Revdanda to Salav — coastal clearance granted
- Proposed Access Controlled Greenfield Konkan Expressway — lapsed
- " Construction of Four Lane Bridge Across Dharamtar Creek between Revas and… — more information requested
10 Maharashtra State Road Development Corporation projects in Raigarh
All 67 Maharashtra State Road Development Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.