What is this project?
Expansion of Existing Steel plant for M.S. Billets from 700 TPD to 2000 TPD, 600 TPD Strips Rolling Mill of MS Coils/MS Sheets/MS Pipes/MS Flats/MS Angles/MS Square Bars/MS Channels/MS Beams/MS Plates & 1400 TPD Rolling mill of TMT Bars/Round Bars/Wire Rods by Hot Rolled Process & Ferro Alloy plant, 1 x 13 MVA SAF 36,000 TPA Located at Plot no. F-18 & F-19, Phase -II Additional MIDC, Jalna and Gut No. 33, Daregaon Jalna , Taluka & Dist: Jalna 431203 (Maharashtra) is a lapsed industrial project in Daregaon (Jalna), Jalna, Maharashtra. The site covers 13.3 acres.
Who is building it?
The applicant is Gajkesari Steels and Allloys PVT LTD.
Has it been approved?
No. The application was lapsed on 7 Apr 2025, so it is no longer under consideration.
Where is it?
In Daregaon (Jalna), Jalna, Maharashtra.
How big is it?
It has a stated cost of ₹425 crore and a site of 13.3 acres.
When was it filed?
The application was filed on 24 Mar 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 7 Apr 2025 |
| Application filed | 24 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Gajkesari Steels and Allloys PVT LTD |
| Land area | 13.3 acres (5.4 ha) |
| Project cost | ₹425 crore |
| Village / locality | Daregaon (Jalna) |
| Taluk / tehsil | Jalna |
| District | Jalna |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05840 |
In context
36 applications in Jalna since January 2022 are in the same category (Industry): 26 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 13.3 acres, this one is smaller than 58% of them.
29 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Daregaon (Jalna), Jalna, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Steel Plant from 700 TPD to 2000 TPD M.S. Billets, 600… — cleared for impact study, 0 m away
- Manufacture of TMT Bar with capacity 500 TPD Stand-alone Rolling Mill (Existing) — cleared for impact study, 200 m away
- Manufacture of M.S Round Bars, Flat Bars, Square Bars & M.S. Angles with… — cleared for impact study, 200 m away
- Proposed Expansion in Production of MS Billets -750 TPD to 2000 TPD and… — environmental approval granted, 300 m away
- Proposed Expansion in Production of MS Billets -750 TPD to 2000 TPD and… — cleared for impact study, 300 m away
- Modernization Cum Expansion of MS Billets Production from 1,58,400 TPA to… — lapsed, 400 m away
- Modernization Cum Expansion of MS Billets Production from 1,58,400 TPA to… — cleared for impact study, 400 m away
- Expansion in Production of MS Billets -750 TPD to 2000 TPD, & Environmental… — environmental approval granted, 550 m away
More from Gajkesari Steels and Allloys PVT LTD in Jalna
- Expansion of Existing Steel Plant from 700 TPD to 2000 TPD M.S. Billets, 600… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.