What is this project?
Proposed Pane Pumped Storage Project with the capacity of 1500 MW at Villages: Pane and Vagheri, Taluka: Mahad, District: Raigad, and Village: Khanu, Taluka: Velhe, District: Pune, Maharashtra by JSW Energy PSP Seven Limited is a lapsed water and irrigation project in Vagheri, Mahad, Raigarh, Maharashtra. The site covers 180.6 acres.
Who is building it?
The applicant is Jsw Energy Psp Seven Limited.
Has it been approved?
No. The application was lapsed on 7 May 2026, so it is no longer under consideration.
Where is it?
In Vagheri, Mahad, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹9,446.2 crore and a site of 180.6 acres.
When was it filed?
The application was filed on 21 Nov 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Pane Pumped Storage Project with the capacity of 1500 MW at Villages: Pane and…
Project details
| Status | Lapsed |
|---|---|
| Status since | 7 May 2026 |
| Application filed | 21 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Jsw Energy Psp Seven Limited |
| Land area | 180.6 acres (73.1 ha) |
| Project cost | ₹9,446.2 crore |
| Village / locality | Vagheri |
| Taluk / tehsil | Mahad |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-07399 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Nov 2025 (this page) | Lapsed | 180.6 acres | ₹9,446.2 crore |
| Amendment filed 17 Oct 2024 | Cleared for impact study | 725.3 acres | ₹9,446.2 crore |
In context
31 applications in Raigarh since January 2022 are in the same category (Water & irrigation): 11 approved, 14 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 180.6 acres, this one is smaller than 73% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vagheri, Mahad, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Pane Pumped Storage Project with the capacity of 1500 MW at Villages:… — cleared for impact study, 500 m away
- Diversion of 79.9793 ha forest land for Warasgaon-Warangi Pumped Storage… — under forest review, 3.7 km away
- Kumbhe Pumped Storage Project (1100 MW) — lapsed, 13.1 km away
- Kumbhe Pumped Storage Project (1100 MW) — cleared for impact study, 13.1 km away
- Industrial project by Dmss Infra (India) Private Limited — lapsed, 16.4 km away
- New project (Green Field) for manufacturing of Specialty Chemicals & Chemical… — cleared for impact study, 16.5 km away
- Proposed Manufacturing of Synthetic Resin-Based Products by M/s Westin Coating… — cleared for impact study, 16.5 km away
- Transfer of Environmental Clearance from M/s. Jaydev Chemical Industries to… — environmental approval granted, 16.8 km away
All 4 Jsw Energy Psp Seven projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.