Proposed Expansion of Steel Plant under Para 7(ii)(a) as per EIA Notification, 2006 and its various amendments including O.M. dated 11.04.2022, from 2.0 MTPA to 2.3 MTPA (Upto 20% Increase) by Adding 0.3 MTPA DI pipes as a New Product is a lapsed industrial project in Barbadi, Wardha, Maharashtra. The site covers 543.6 acres.
Who is building it?
The applicant is Evonith Value Steel Limited.
Has it been approved?
No. The application was lapsed on 17 May 2025, so it is no longer under consideration.
Where is it?
In Barbadi, Wardha, Maharashtra.
How big is it?
It has a stated cost of ₹7,697 crore and a site of 543.6 acres.
When was it filed?
The application was filed on 31 Mar 2025.
Project details
| Official title | Proposed Expansion of Steel Plant under Para 7(ii)(a) as per EIA Notification, 2006 and its various amendments including O.M. dated 11.04.2022, from 2.0 MTPA to 2.3 MTPA (Upto 20% Increase) by Adding 0.3 MTPA DI pipes as a New Product at Village Bhugaon, Bhugaon Link Road, District-Wardha, Maharashtra By Evonith Value Steel Limited |
|---|---|
| Status | Lapsed |
| Status since | 17 May 2025 |
| Application filed | 31 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Evonith Value Steel Limited |
| Land area | 543.6 acres (220 ha) |
| Project cost | ₹7,697 crore |
| Village / locality | Barbadi |
| Taluk / tehsil | Wardha |
| District | Wardha |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-08518 |
In context
15 applications in Wardha since January 2022 are in the same category (Industry): 4 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. At 543.6 acres, this one is larger than 67% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barbadi, Wardha, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion and modification of existing 1.0 MTPA Steel Plant by adding 0.3 MTPA… — initial checks, 0 m away
- Transfer/change of company name in the Environmental Clearance titled… — environmental approval granted, 0 m away
- Transfer/change of company name in the Environmental Clearance titled… — environmental approval granted, 0 m away
- Expansion of Steel plant (from 1.0 MTPA to 2.0 MTPA) at Bhugaon Link Road,… — lapsed, 150 m away
- Industrial project by Evonith Value Steels Limited — withdrawn, 150 m away
- Proposed Expansion of Steel Plant with Cold Rolled Products from 0.6 to 1.6… — under environmental review, 150 m away
- Indrajit Power Private Limited , 80 MW Thermal Power Plant — lapsed, 1.2 km away
- Expansion and Modernization of Existing Integrated Steel Plant by Enhancing… — under environmental review, 1.7 km away
More from Evonith Value Steel Limited in Wardha
- Proposed 3.5 MTPA Integrated Steel Plant by Installing Basic Oxygen Furnace… — under environmental review
- Proposed Expansion of Steel Plant with Cold Rolled Products from 0.6 to 1.6… — under environmental review
- Transfer/change of company name in the Environmental Clearance titled… — environmental approval granted
- Transfer/change of company name in the Environmental Clearance titled… — environmental approval granted
- Expansion and modification of existing 1.0 MTPA Steel Plant by adding 0.3 MTPA… — initial checks
- Expansion of Steel plant (from 1.0 MTPA to 2.0 MTPA) at Bhugaon Link Road,… — lapsed
All 8 Evonith Value Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.