Quick answers
What is this project?
Greenfield Project comprising of establishment of DRI Kilns (Sponge iron – 7,00,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / MS Slab – 6,72,000 TPA), Rolling Mill (TMT Bars, Structural Steel - Angles, Channels, Gutters, Coils, Flat Bars, Strips, MS Pipes, MS Tubes, Galvanized Pipes and angles (85 % Hot charging with Hot Billets and remaining 15% through RHF with LDO/Producer Gas as fuel – 7,00,000 TPA), Coal Gasifier for Rolling Mill (6,300 Nm3/ hr), Ferro Alloys – 3 x is a lapsed industrial project in Mul, 0, Chandrapur, Maharashtra. The site covers 207.7 acres.
Who is building it?
The applicant is Bhagyalaxmi Metals Private Limited.
Has it been approved?
No. The application was lapsed on 25 Feb 2025, so it is no longer under consideration.
Where is it?
In Mul, 0, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹615 crore and a site of 207.7 acres.
When was it filed?
The application was filed on 25 Feb 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Greenfield Project comprising of establishment of DRI Kilns (Sponge iron – 7,00,000…
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Feb 2025 |
| Application filed | 25 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Bhagyalaxmi Metals Private Limited |
| Land area | 207.7 acres (84.1 ha) |
| Project cost | ₹615 crore |
| Village / locality | Mul |
| Taluk / tehsil | 0 |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-08932 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 25 Feb 2025 (this page) | Lapsed | 207.7 acres | ₹615 crore |
| New project filed 27 Feb 2024 | Environmental approval granted | 207.7 acres | ₹615 crore |
| Early planning filed 28 Nov 2022 | Cleared for impact study | 207.7 acres | ₹615 crore |
In context
55 applications in Chandrapur since January 2022 are in the same category (Industry): 38 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 207.7 acres, this one is larger than 55% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mul, 0, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Project comprising of establishment of DRI Kilns (Sponge iron –… — environmental approval granted, 0 m away
- Greenfield Project comprising of establishment of DRI Kilns (Sponge iron –… — cleared for impact study, 0 m away
- Proposed Expansion and Modernization of existing 33,000 TPA Sponge Iron Plant… — cleared for impact study, 3.2 km away
- Environmental Clearance for the proposed Sponge Iron 180 TPD, 30 MW Power… — environmental approval granted, 3.2 km away
- Proposed Expansion of DRI Kilns (Sponge Iron) from 33,000 TPA to 3,96,000 TPA… — cleared for impact study, 3.2 km away
- 2X350 TPD DRI Plant for Production of 2,31,000 TPA of Sponge Iron, 2 X 40 T of… — environmental approval granted, 3.3 km away
- 2X350 TPD DRI Plant for Production of 2,31,000 TPA of Sponge Iron, 2 X 40 T of… — cleared for impact study, 3.3 km away
- Sponge Iron Plant (3x600 TPD) to produce 6,21,000 TPA DRI, 30 X 3 TG Set ,… — cleared for impact study, 3.6 km away
All 3 Bhagyalaxmi Metals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.