Quick answers
What is Aruna Kolamb Pumped Storage Project (1200 MW)?
Aruna Kolamb Pumped Storage Project (1200 MW) is a proposed water and irrigation project in Gothane, Panhala, Kolhapur, Maharashtra. The site covers 946.6 acres.
Who is building it?
The applicant is Thdc India Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 27 Apr 2026), as of 27 Nov 2026.
Where is it?
In Gothane, Panhala, Kolhapur, Maharashtra.
How big is it?
It has a stated cost of ₹7,394.5 crore and a site of 946.6 acres.
When was it filed?
The application was filed on 10 Mar 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 27 Apr 2026 |
| Application filed | 10 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Thdc India Limited |
| Land area | 946.6 acres (383.1 ha) |
| Project cost | ₹7,394.5 crore |
| Village / locality | Gothane |
| Taluk / tehsil | Panhala |
| District | Kolhapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-12620 |
In context
10 applications in Kolhapur since January 2022 are in the same category (Water & irrigation): 2 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected.
Where it is
Gothane, Panhala, Kolhapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Aruna Pumped Storage Project (1500 MW) — under environmental review, 7.9 km away
- Two Lane Paved Shoulder in the state of Maharashtra from T-Junction at (NH… — under forest review, 9 km away
- Addition of Raw Materials (B-Heavy Molasses & Cane Juice / Syrup) in Existing… — initial checks, 9.7 km away
- Two Lane Paved Shoulder in the state of Maharashtra from T-Junction at (NH –… — lapsed, 11.2 km away
- Diversion of Forest Land for Laying of Underground Ofc Duct and Cable Within… — lapsed, 14.2 km away
- Diversion of Forest Land for the Construction of an Approach Road, Laying of… — under forest review, 14.9 km away
- Diversion of Forest Land for Construction of Two Lane With Paved Shoulder of… — lapsed, 15.1 km away
- MahaNet-I(BHaratNet-II)-Kolhapur-Shahuwadi-Application-1 — lapsed, 17.6 km away
More from Thdc India Limited in Kolhapur
- Aruna Pumped Storage Project (1500 MW) — under environmental review
All 17 Thdc India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.