Quick answers
What is this project?
Diversion of Forest Land for the Construction of an Approach Road, Laying of an Underground Electricity Line and Drinking Water Pipeline to Private Agricultural Property is a proposed building project in Gagan Bavda, Bavda, Kolhapur, Maharashtra. The site covers 0.9 acres.
Who is building it?
The applicant is Nilesh Popatlal Dorle.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Gagan Bavda, Bavda, Kolhapur, Maharashtra.
How big is it?
It has a stated cost of ₹5 lakh; a site of 0.9 acres and 3,200 m² of forest land.
When was it filed?
The application was filed on 16 Jun 2025.
Project details
| Official title | Proposal for Diversion of Forest Land for the Construction of an Approach Road, Laying of an Underground Electricity Line and Drinking Water Pipeline to Private Agricultural Property at Gaganbawada Village Tal- Gaganbawada Dist- Kolhapur |
|---|---|
| Status | Under forest review |
| Status since | 23 Sept 2026 |
| Application filed | 16 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Nilesh Popatlal Dorle |
| Land area | 3,800 m² |
| Forest land | 3,200 m² |
| Project cost | ₹5 lakh |
| Village / locality | Gagan Bavda |
| Taluk / tehsil | Bavda |
| District | Kolhapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15927 |
In context
33 applications in Kolhapur since January 2022 are in the same category (Buildings & townships): 23 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.9 acres, this one is smaller than 91% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gagan Bavda, Bavda, Kolhapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Construction of Two Lane With Paved Shoulder of… — lapsed, 1.5 km away
- Two Lane Paved Shoulder in the state of Maharashtra from T-Junction at (NH –… — lapsed, 4.2 km away
- Addition of Raw Materials (B-Heavy Molasses & Cane Juice / Syrup) in Existing… — initial checks, 6.6 km away
- Aruna Pumped Storage Project (1500 MW) — under environmental review, 7.1 km away
- Two Lane Paved Shoulder in the state of Maharashtra from T-Junction at (NH… — under forest review, 9.2 km away
- Aruna Kolamb Pumped Storage Project (1200 MW) — cleared for impact study, 14.9 km away
- MahaNet-I(Bharat Net-II)Kolhapur — lapsed, 17.2 km away
- Bharat Net-II(Maha Net-I) — lapsed, 17.2 km away