Quick answers
What is this project?
Addition of Raw Materials (B-Heavy Molasses & Cane Juice / Syrup) in Existing Distillery for Manufacturing of RS/ ENA/ Ethanol through Enhancement of Capacity from 60 KLPD to 85 KLPD & 90 KLPD by Padmashree Dr. D. Y. Patil Sahakari Sakhar Karkhana Ltd. (PDDYPSSKL), Dnyanshantinagar, Village: Vesaraf – Palasambe, Tal.: Gaganbavada, Dist.: Kolhapur, Maharashtra is a proposed building project in Asalaj, Bavda, Kolhapur, Maharashtra. The site covers 85.7 acres.
Who is building it?
The applicant is Padmashri Dr D Y Patil Sahakari Sakhar Karkhana LTD; Dnyanshantinagar.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Asalaj, Bavda, Kolhapur, Maharashtra.
How big is it?
It has a stated cost of ₹100.7 crore and a site of 85.7 acres.
When was it filed?
The application was filed on 21 Jul 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 21 Jul 2025 |
| Application filed | 21 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Padmashri Dr D Y Patil Sahakari Sakhar Karkhana LTD; Dnyanshantinagar |
| Land area | 85.7 acres (34.7 ha) |
| Project cost | ₹100.7 crore |
| Village / locality | Asalaj |
| Taluk / tehsil | Bavda |
| District | Kolhapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-07640 |
In context
33 applications in Kolhapur since January 2022 are in the same category (Buildings & townships): 23 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 85.7 acres, this one is larger than 79% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Asalaj, Bavda, Kolhapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Two Lane Paved Shoulder in the state of Maharashtra from T-Junction at (NH –… — lapsed, 2.5 km away
- Two Lane Paved Shoulder in the state of Maharashtra from T-Junction at (NH… — under forest review, 2.7 km away
- Aruna Pumped Storage Project (1500 MW) — under environmental review, 3.8 km away
- Diversion of Forest Land for the Construction of an Approach Road, Laying of… — under forest review, 6.6 km away
- Diversion of Forest Land for Construction of Two Lane With Paved Shoulder of… — lapsed, 7.6 km away
- Aruna Kolamb Pumped Storage Project (1200 MW) — cleared for impact study, 9.7 km away
- Diversion of 35.42 HA. of Reserved Forest Land for installation of Wind Power… — lapsed, 16.9 km away
- Diversion of Forest Land for Underground Ofc Duct and Cable Within Row of… — more information requested, 19.1 km away