Quick answers
What is this project?
Modification and Expansion of Existing Scrap Processing Unit with Addition of Manufacturing of 6,93,000 TPA Billets through 3 × 50 T Induction Furnaces and 7,93,000 TPA Rolled Products/TMT Bars through Rolling Mill comprising ,6,93,000 TPA through Direct Hot Charging Route and 1,00,000 TPA through RHF Route is a proposed industrial project in Jalna, Maharashtra. The site covers 16.5 acres.
Who is building it?
The applicant is Icon Steel and Alloys Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Jun 2026), as of 27 Nov 2026.
Where is it?
In Jalna, Maharashtra.
How big is it?
It has a stated cost of ₹458.4 crore and a site of 16.5 acres.
When was it filed?
The application was filed on 5 Jun 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 Jun 2026 |
| Application filed | 5 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Icon Steel and Alloys Private Limited |
| Land area | 16.5 acres (6.7 ha) |
| Project cost | ₹458.4 crore |
| Village / locality | Jalna |
| Taluk / tehsil | Jalna |
| District | Jalna |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-12787 |
In context
36 applications in Jalna since January 2022 are in the same category (Industry): 26 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 16.5 acres, this one is smaller than 56% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jalna, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ferro-Alloys unit to manufacture 66,000 TPA (FeMn/ SiMn) by Installing 2x18… — cleared for impact study, 100 m away
- Ferro-Alloys unit to manufacture 66,000 TPA (FeMn/ SiMn) by Installing 2x18… — environmental approval granted, 250 m away
- Expansion of Integrated Steel Plant for additional product 6000 TPD… — cleared for impact study, 450 m away
- Modernization Cum Expansion of MS Billets Production from 1,58,400 TPA to… — lapsed, 450 m away
- Modernization Cum Expansion of MS Billets Production from 1,58,400 TPA to… — cleared for impact study, 450 m away
- Manufacture of TMT Bar with capacity 1000 TPD Stand-alone Rolling Mill… — cleared for impact study, 650 m away
- Manufacture of TMT Bar with capacity 500 TPD Stand-alone Rolling Mill (Existing) — cleared for impact study, 700 m away
- Expansion of Existing Steel plant for M.S. Billets from 700 TPD to 2000 TPD,… — lapsed, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.