Project details
| Status | Under environmental review |
|---|---|
| Status since | 17 Sept 2026 |
| Application filed | 21 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Jawaharlal Nehru Port Authority |
| Land area | 38 acres (15.4 ha) |
| Project cost | ₹1 crore |
| Village / locality | Kukae |
| Taluk / tehsil | Palghar |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-12899 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Sept 2026 | Environmental approval granted | 38 acres | ₹1 crore |
| Early planning filed 21 Apr 2026 (this page) | Under environmental review | 38 acres | ₹1 crore |
In context
47 applications in Palghar since January 2022 are in the same category (Mining): 16 approved, 7 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 38 acres, this one is larger than 80% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Kukae, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Khanivade stone Quarry - 15.39 Ha in connection with Vadhvan Port Project by… — environmental approval granted, 0 m away
- Proposed Quarry for Construction of Vadhavan Port, Road & Railway Project by… — lapsed, 600 m away
- Proposed Quarry for Construction of Vadhavan Port, Road & Railway Project by… — in-principle approval, conditions pending, 1 km away
- Khanivade stone Quarry - 1.21 Ha in connection with Vadhvan Port Project by… — environmental approval granted, 1.3 km away
- Khaniwade,Gargaon & 22 Villages Regional Rural Water Supply Scheme Tal.… — lapsed, 1.8 km away
- Proposed Quarry for Construction of Vadhavan Port, Road & Railway Project by… — lapsed, 2 km away
- DIVERSION OF 0.6860 Ha. FOREST LAND FOR SHIFTING OF EXISTING 220kV TARAPUR -… — lapsed, 2.8 km away
- DIVERSION OF 2.0335 Ha. FOREST LAND FOR SHIFTING OF EXISTING 220 kV TARAPUR -… — in-principle approval, conditions pending, 2.8 km away
More from Jawaharlal Nehru Port Authority in Palghar
- Widening and Strengthening of the existing road (ODR 35) from the village… — under forest review
- Proposed Gargaon stone Quarry having lease area of 24.94 Ha in connection with… — environmental approval granted
- Gargaon stone - 17.08 Ha in connection with Vadhvan Port Project by Jawaharlal… — environmental approval granted
- Khanivade stone Quarry - 1.21 Ha in connection with Vadhvan Port Project by… — environmental approval granted
- Gargaon stone - 17.08 Ha in connection with Vadhvan Port Project by Jawaharlal… — under environmental review
- Proposed Gargaon stone Quarry having lease area of 24.94 Ha in connection with… — under environmental review
17 Jawaharlal Nehru Port Authority projects in Palghar
All 31 Jawaharlal Nehru Port Authority projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.