Project details
| Official title | Proposed Quarry for Construction of Vadhavan Port, Road & Railway Project, at Village – Gargaon & Khaniwde along with existing road widening by Jawaharlal Nehru Port Authority |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 21 Sept 2026 |
| Application filed | 22 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Jawaharlal Nehru Port Authority |
| Land area | 180.2 acres (72.9 ha) |
| Forest land | 164.6 acres (66.6 ha) |
| Project cost | ₹5,111 crore |
| Village / locality | Gargaon |
| Taluk / tehsil | Palghar |
| District | Palghar |
| State | Maharashtra |
| Location from | Site area on record |
| Our reference | WID-MH-15721 |
In context
47 applications in Palghar since January 2022 are in the same category (Mining): 16 approved, 7 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 180.2 acres, this one is larger than 93% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Gargaon, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Quarry for Construction of Vadhavan Port, Road & Railway Project by… — lapsed, 550 m away
- Khanivade stone Quarry - 1.21 Ha in connection with Vadhvan Port Project by… — environmental approval granted, 650 m away
- Khaniwade,Gargaon & 22 Villages Regional Rural Water Supply Scheme Tal.… — lapsed, 800 m away
- Proposed Quarry for Construction of Vadhavan Port, Road & Railway Project by… — lapsed, 950 m away
- Khanivade stone Quarry - 15.39 Ha in connection with Vadhvan Port Project by… — environmental approval granted, 1 km away
- Khanivade stone Quarry - 15.39 Ha in connection with Vadhvan Port Project by… — under environmental review, 1 km away
- Proposed Gargaon stone Quarry having lease area of 24.94 Ha in connection with… — environmental approval granted, 2.4 km away
- Proposed Gargaon stone Quarry having lease area of 24.94 Ha in connection with… — under environmental review, 2.4 km away
More from Jawaharlal Nehru Port Authority in Palghar
- Widening and Strengthening of the existing road (ODR 35) from the village… — under forest review
- Khanivade stone Quarry - 15.39 Ha in connection with Vadhvan Port Project by… — environmental approval granted
- Proposed Gargaon stone Quarry having lease area of 24.94 Ha in connection with… — environmental approval granted
- Gargaon stone - 17.08 Ha in connection with Vadhvan Port Project by Jawaharlal… — environmental approval granted
- Khanivade stone Quarry - 1.21 Ha in connection with Vadhvan Port Project by… — environmental approval granted
- Khanivade stone Quarry - 15.39 Ha in connection with Vadhvan Port Project by… — under environmental review
17 Jawaharlal Nehru Port Authority projects in Palghar
All 31 Jawaharlal Nehru Port Authority projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.