Project details
| Official title | Proposed Quarry for Construction of Vadhavan Port, Road & Railway Project, at Village – Khanivade (Location no. 3) by JNPA |
|---|---|
| Status | Lapsed |
| Status since | 23 Oct 2024 |
| Application filed | 19 Apr 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Jawaharlal Nehru Port Authority |
| Land area | 221.2 acres (89.5 ha) |
| Forest land | 221.2 acres (89.5 ha) |
| Project cost | ₹76,220 crore |
| Village / locality | Khanivade |
| Taluk / tehsil | Palghar |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15546 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Apr 2024 (this page) | Lapsed | 221.2 acres | ₹76,220 crore |
| New project filed 19 Apr 2024 | Lapsed | 61.8 acres | ₹76,220 crore |
In context
250 applications in Palghar since January 2022 are in the same category (Buildings & townships): 152 approved, 49 filed or under review, and 49 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 221.2 acres, this one is larger than 98% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khanivade, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Quarry for Construction of Vadhavan Port, Road & Railway Project by… — in-principle approval, conditions pending, 550 m away
- Khanivade stone Quarry - 15.39 Ha in connection with Vadhvan Port Project by… — environmental approval granted, 600 m away
- Khanivade stone Quarry - 15.39 Ha in connection with Vadhvan Port Project by… — under environmental review, 600 m away
- Khanivade stone Quarry - 1.21 Ha in connection with Vadhvan Port Project by… — environmental approval granted, 700 m away
- Khaniwade,Gargaon & 22 Villages Regional Rural Water Supply Scheme Tal.… — lapsed, 1.3 km away
- Proposed Quarry for Construction of Vadhavan Port, Road & Railway Project by… — lapsed, 1.4 km away
- Proposed Gargaon stone Quarry having lease area of 24.94 Ha in connection with… — environmental approval granted, 2.8 km away
- Proposed Gargaon stone Quarry having lease area of 24.94 Ha in connection with… — under environmental review, 2.8 km away
More from Jawaharlal Nehru Port Authority in Palghar
- Widening and Strengthening of the existing road (ODR 35) from the village… — under forest review
- Khanivade stone Quarry - 15.39 Ha in connection with Vadhvan Port Project by… — environmental approval granted
- Proposed Gargaon stone Quarry having lease area of 24.94 Ha in connection with… — environmental approval granted
- Gargaon stone - 17.08 Ha in connection with Vadhvan Port Project by Jawaharlal… — environmental approval granted
- Khanivade stone Quarry - 1.21 Ha in connection with Vadhvan Port Project by… — environmental approval granted
- Khanivade stone Quarry - 15.39 Ha in connection with Vadhvan Port Project by… — under environmental review
17 Jawaharlal Nehru Port Authority projects in Palghar
All 31 Jawaharlal Nehru Port Authority projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.