What is Developing? Open the mapMap

WithdrawnBuildings & townships · Aurangabad, Maharashtra

Proposed Expansion of Industrial Shed Construction Project located at Gut no. 194, 182(P), 195(P), 183(P), 191(P), Village Limbejalgaon, Tal. Gangapur, Dist Chhatrapati Sambhajinagar-431133 by M/s. Pitti Engineering Limited

Proposed Expansion of Industrial Shed Construction Project located at Gut no. 194, 182(P), 195(P), 183(P), 191(P), Village Limbejalgaon, Tal. Gangapur, Dist Chhatrapati Sambhajinagar-431133 by M/s. Pitti Engineering Limited is a withdrawn building project in Limbe Jalgaon, Gangapur, Aurangabad, Maharashtra. The site covers 20 acres. Its stated project cost is ₹461 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 17 Jun 2026).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Industrial Shed Construction Project located at Gut no. 194,…

Project details

StatusWithdrawn
Status since17 Jun 2026
Application filed17 Jun 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantPitti Engineering Limited
Land area20 acres (8.1 ha)
Project cost₹461 crore
Village / localityLimbe Jalgaon
Taluk / tehsilGangapur
DistrictAurangabad
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-13771

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 17 Jun 2026 (this page)Withdrawn20 acres₹461 crore
Expansion filed 17 Jun 2026Under environmental review20 acres₹466 crore

In context

91 applications in Aurangabad since January 2022 are in the same category (Buildings & townships): 52 approved, 18 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 20 acres, this one is larger than 54% of them.

Where it is

Limbe Jalgaon, Gangapur, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.