Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Oct 2026 |
| Application filed | 8 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Godawari New Energy Private Limited |
| Use | Industrial |
| Land area | 114.9 acres (46.5 ha) |
| Built-up area | 95,004 m² (10,22,614 sq ft) |
| Project cost | ₹10.8 crore |
| Village / locality | Jambhali |
| Taluk / tehsil | Paithan |
| District | Aurangabad |
| State | Maharashtra |
| Location from | Site area on record |
| Our reference | WID-MH-13798 |
In context
91 applications in Aurangabad since January 2022 are in the same category (Buildings & townships): 52 approved, 18 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 114.9 acres, this one is larger than 90% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jambhali, Paithan, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed solar cell and module manufacturing facility at Plot No. 138, Sector… — environmental approval granted, 750 m away
- Proposed Industrial Shed Project at Plot No. 33, Sector 4, Nilajgaon , Bidkin… — environmental approval granted, 1.5 km away
- Proposed Greenfield Industrial Project by M/s "Toyota Tsusho India Pvt. Ltd."… — environmental approval granted, 2.1 km away
- Mega Industrial Park in Bidkin, Maharashtra — environmental approval granted, 3.8 km away
- Mega Industrial Park in Bidkin, Maharashtra — environmental approval granted, 3.8 km away
- Proposed Industrial Unit at Plot No. 28, Auric, Bidkin, Sector-25, District… — more information requested, 4.4 km away
- Synthetic Organic Chemicals manufacturing facility by Lubrizol India Pvt.… — cleared for impact study, 4.7 km away
- Transfer of EC vide letter no.SIA/MH/INFRA2/517793/2025 dt. 14.07.2025,… — environmental approval granted, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.