Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Aug 2026 |
| Application filed | 8 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Uno Minda Limited |
| Use | Industrial |
| Land area | 88.5 acres (35.8 ha) |
| Built-up area | 70,448 m² (7,58,295 sq ft) |
| Project cost | ₹172.7 crore |
| Village / locality | Jambhali |
| Taluk / tehsil | Paithan |
| District | Aurangabad |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14252 |
In context
91 applications in Aurangabad since January 2022 are in the same category (Buildings & townships): 52 approved, 18 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 88.5 acres, this one is larger than 85% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jambhali, Paithan, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Greenfield Industrial Project by M/s "Toyota Tsusho India Pvt. Ltd."… — environmental approval granted, 650 m away
- Proposed Industrial Building Project at Plot No. 177 A Sector 4, Auric,… — environmental approval granted, 1.5 km away
- Proposed solar cell and module manufacturing facility at Plot No. 138, Sector… — environmental approval granted, 2.1 km away
- Mega Industrial Park in Bidkin, Maharashtra — environmental approval granted, 2.4 km away
- Mega Industrial Park in Bidkin, Maharashtra — environmental approval granted, 2.4 km away
- Proposed Industrial Unit at Plot No. 28, Auric, Bidkin, Sector-25, District… — more information requested, 3.2 km away
- Transfer of EC vide letter no.SIA/MH/INFRA2/517793/2025 dt. 14.07.2025,… — environmental approval granted, 3.3 km away
- Proposed Electric Passenger Car Manufacturing Plant [120 JPH] at Sector 22,… — environmental approval granted, 3.3 km away
All 9 Uno Minda projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.