Quick answers
What is this project?
Expansion by addition of 1x660 MW Domestic Coal based Thermal Power Plant (Phase-II) at Mohabala MIDC Growth Centre in Warora (Tehsil), Chandrapur – District, Maharashtra is a proposed power project in Charurkhati, Warora, Chandrapur, Maharashtra. The site covers 430 acres.
Who is building it?
The applicant is Gmr Warora Energy Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Charurkhati, Warora, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹11,331 crore and a site of 430 acres.
When was it filed?
The application was filed on 22 May 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 1 Jul 2026 |
| Application filed | 22 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Power |
| Applicant | Gmr Warora Energy Limited |
| Land area | 430 acres (174 ha) |
| Project cost | ₹11,331 crore |
| Village / locality | Charurkhati |
| Taluk / tehsil | Warora |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13982 |
In context
10 applications in Chandrapur since January 2022 are in the same category (Power): 1 approved, 7 filed or under review, and 2 withdrawn, lapsed or rejected. At 430 acres, this one is larger than 50% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Charurkhati, Warora, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated Cement Plant with production capacity of Clinker: 1.5 Million TPA;… — environmental approval granted, 3.1 km away
- Integrated Cement Plant with production capacity of Clinker: 1.5 Million TPA;… — cleared for impact study, 3.1 km away
- Kondhala Limestone Block" (105.0 ha.) with Limestone Capacity of 2.25 Million… — lapsed, 3.1 km away
- Kondhala Limestone Block" (105.0 ha.) with Limestone Capacity of 2.25 Million… — cleared for impact study, 3.1 km away
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area for Proposed Kondhala… — under forest review, 3.3 km away
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area and Tree cutting permission… — not approved, 3.3 km away
- Amalgamated Yekona I & II OC (Phase-I) — under environmental review, 4.6 km away
- Amalgamated Yekona I & II OC (Phase-I) — environmental approval granted, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.