Quick answers
What is this project?
Integrated Cement Plant with production capacity of Clinker: 1.5 Million TPA; Cement: 3.5 Million TPA (OPC, PPC, PSC, SRC, RHPC & Composite Cement); CPP: 20 MW; WHRS: 9.5 MW; Synthetic Gypsum: 1560 TPD (65 TPH) and DG Sets: 2500 KVA (1 x 2500 KVA or 2 x 1000 KVA & 1 x 500 KVA or 1 x 1000 KVA, 2 x 500 KVA & 2 x 250 KVA) at Villages: Nimsala, Kondhala & Dahegaon, Taluka: Warora, District: Chandrapur (Maharashtra) by Shree Cement Limited is an approved industrial project in Dahegaon, Warora, Chandrapur, Maharashtra. The site covers 387.2 acres.
Who is building it?
The applicant is Shree Cement Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Jun 2026), as of 27 Nov 2026.
Where is it?
In Dahegaon, Warora, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹1,737.2 crore and a site of 387.2 acres.
When was it filed?
The application was filed on 10 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Jun 2026 |
| Application filed | 10 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Shree Cement Limited |
| Land area | 387.2 acres (156.7 ha) |
| Project cost | ₹1,737.2 crore |
| Village / locality | Dahegaon |
| Taluk / tehsil | Warora |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13025 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Apr 2026 (this page) | Environmental approval granted | 387.2 acres | ₹1,737.2 crore |
| Early planning filed 21 Apr 2025 | Cleared for impact study | 387.2 acres | ₹1,737.2 crore |
In context
55 applications in Chandrapur since January 2022 are in the same category (Industry): 38 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 387.2 acres, this one is larger than 78% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dahegaon, Warora, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated Cement Plant with production capacity of Clinker: 1.5 Million TPA;… — cleared for impact study, 0 m away
- Kondhala Limestone Block" (105.0 ha.) with Limestone Capacity of 2.25 Million… — lapsed, 250 m away
- Kondhala Limestone Block" (105.0 ha.) with Limestone Capacity of 2.25 Million… — cleared for impact study, 250 m away
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area for Proposed Kondhala… — under forest review, 350 m away
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area and Tree cutting permission… — not approved, 350 m away
- Expansion by addition of 1x660 MW Domestic Coal based Thermal Power Plant… — under environmental review, 3.1 km away
- Wardha-Ballarshah 3rd Railway Line — in-principle approval, conditions pending, 4.1 km away
- Amalgamated Yekona I & II OC (Phase-I) — under environmental review, 7.5 km away
More from Shree Cement Limited in Chandrapur
- Kondhala Limestone Block" (105.0 ha.) with Limestone Capacity of 2.25 Million… — lapsed
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area for Proposed Kondhala… — under forest review
- Kondhala Limestone Block" (105.0 ha.) with Limestone Capacity of 2.25 Million… — cleared for impact study
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area and Tree cutting permission… — not approved
6 Shree Cement projects in Chandrapur
All 63 Shree Cement projects across India
About this information