Kondhala Limestone Block" (105.0 ha.) with Limestone Capacity of 2.25 Million TPA, Total Waste: 3.214 Million TPA,Top Soil 0.022 Million TPA & ROM Rejects: 0.225 Million TPA (Total Excavation: 5.711) and total material handling: 6.711 Million TPA including Re-handling of waste material: 1.0 Million TPA from proposed dumps and installation of Primary Crushers: 1200 TPH & 500 TPH and Secondary Crusher: 400 TPH is a lapsed mining project in Kondala, Warora, Chandrapur, Maharashtra. The site covers 259.5 acres.
Who is building it?
The applicant is Shree Cement Limited.
Has it been approved?
No. The application was lapsed on 15 Jul 2026, so it is no longer under consideration.
Where is it?
In Kondala, Warora, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹235.8 crore and a site of 259.5 acres.
When was it filed?
The application was filed on 13 Mar 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Kondhala Limestone Block" (105.0 ha.) with Limestone Capacity of 2.25 Million TPA, Total…
Project details
| Official title | Kondhala Limestone Block" (105.0 ha.) with Limestone Capacity of 2.25 Million TPA, Total Waste: 3.214 Million TPA,Top Soil 0.022 Million TPA & ROM Rejects: 0.225 Million TPA (Total Excavation: 5.711) and total material handling: 6.711 Million TPA including Re-handling of waste material: 1.0 Million TPA from proposed dumps and installation of Primary Crushers: 1200 TPH & 500 TPH and Secondary Crusher: 400 TPH along with Wobbler at Village Kondhala, Taluka Warora, District: Chandrapur, Maharashtra |
|---|---|
| Status | Lapsed |
| Status since | 15 Jul 2026 |
| Application filed | 13 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shree Cement Limited |
| Land area | 259.5 acres (105 ha) |
| Project cost | ₹235.8 crore |
| Village / locality | Kondala |
| Taluk / tehsil | Warora |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-12859 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Mar 2026 (this page) | Lapsed | 259.5 acres | ₹235.8 crore |
| Early planning filed 29 Nov 2024 | Cleared for impact study | 259.5 acres | ₹235.8 crore |
In context
341 applications in Chandrapur since January 2022 are in the same category (Mining): 280 approved, 28 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 259.5 acres, this one is larger than 76% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 291 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Kondala, Warora, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kondhala Limestone Block" (105.0 ha.) with Limestone Capacity of 2.25 Million… — cleared for impact study, 0 m away
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area for Proposed Kondhala… — under forest review, 200 m away
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area and Tree cutting permission… — not approved, 200 m away
- Integrated Cement Plant with production capacity of Clinker: 1.5 Million TPA;… — environmental approval granted, 250 m away
- Integrated Cement Plant with production capacity of Clinker: 1.5 Million TPA;… — cleared for impact study, 250 m away
- Expansion by addition of 1x660 MW Domestic Coal based Thermal Power Plant… — under environmental review, 3.1 km away
- Wardha-Ballarshah 3rd Railway Line — in-principle approval, conditions pending, 3.9 km away
- Amalgamated Yekona I & II OC (Phase-I) — under environmental review, 7.5 km away
More from Shree Cement Limited in Chandrapur
- Integrated Cement Plant with production capacity of Clinker: 1.5 Million TPA;… — environmental approval granted
- Integrated Cement Plant with production capacity of Clinker: 1.5 Million TPA;… — cleared for impact study
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area for Proposed Kondhala… — under forest review
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area and Tree cutting permission… — not approved
6 Shree Cement projects in Chandrapur
All 63 Shree Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.