Quick answers
What is this project?
Diversion of Protected Forest Land for Construction of Approach Road including Water Pipeline, Electrical Line, Drainage line and any other utility services etc. along the road" for Private Non-Forest land Survey No. 41/7" is a proposed road project in Tambas, Karjat, Raigarh, Maharashtra. The site covers 34.4 acres.
Who is building it?
The applicant is Narendra Jagannath Salvi.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Tambas, Karjat, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹60 lakh; a site of 34.4 acres and 890 m² of forest land.
When was it filed?
The application was filed on 23 Feb 2026.
Project details
| Official title | Diversion of Protected Forest Land for Construction of Approach Road including Water Pipeline, Electrical Line, Drainage line and any other utility services etc. along the road" for Private Non-Forest land Survey No. 41/7", at Village Tambas, Tal. Karjat, Dist. Raigad, Maharashtra State in favour of Mr. Narendra Jagannath Salvi. |
|---|---|
| Status | Initial checks |
| Status since | 23 Feb 2026 |
| Application filed | 23 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Narendra Jagannath Salvi |
| Land area | 34.4 acres (13.9 ha) |
| Forest land | 890 m² |
| Project cost | ₹60 lakh |
| Village / locality | Tambas |
| Taluk / tehsil | Karjat |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14464 |
In context
70 applications in Raigarh since January 2022 are in the same category (Roads & highways): 10 approved, 33 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 34.4 acres, this one is larger than 67% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tambas, Karjat, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Diversion Of 0.0252 Ha. Protected Forest Land — lapsed, 150 m away
- Diversion of Forest Land for Laying of Underground Ofc Duct & Cable Within Row… — lapsed, 3.7 km away
- Aadarsh Public Charitable Trust's, Sundar English Medium School has submitted… — initial checks, 4.1 km away
- The Diversion Of 0.1601 Ha. Protected Forest Land — under forest review, 4.4 km away
- Saidongar-1 Karjat (3000 MW) Off-stream Open Loop Pumped Storage Project — under forest review, 5.5 km away
- Saidongar-1 Karjat (3000 MW) Off-stream Open Loop Pumped Storage Project — forest land use approved, 5.5 km away
- Stone quarry proposal of Mr. Vijay Bahadur Jaikaran Singh over an extent of… — environmental approval granted, 6.2 km away
- Stone quarry proposal of Sou. Aruna Santosh Bhoir, over an extent of area 2.32… — environmental approval granted, 6.6 km away