Quick answers
What is The Diversion Of 0.0252 Ha. Protected Forest Land?
The Diversion Of 0.0252 Ha. Protected Forest Land is a lapsed building project in Tambas, Karjat, Raigarh, Maharashtra. The site covers 0.1 acres.
Who is building it?
The applicant is Pragati Patil.
Has it been approved?
No. The application was lapsed on 26 Apr 2025, so it is no longer under consideration.
Where is it?
In Tambas, Karjat, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹5 lakh; a site of 0.1 acres and 250 m² of forest land.
When was it filed?
The application was filed on 18 Mar 2024.
Project details
| Official title | Proposal For The Diversion Of 0.0252 Ha. Protected Forest Land In Survey No.38 Of Village Tambas Tal.- Karjat, Dist. Raigad For Approach Road & Other Ancillary Activities. |
|---|---|
| Status | Lapsed |
| Status since | 26 Apr 2025 |
| Application filed | 18 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Pragati Patil |
| Land area | 300 m² |
| Forest land | 250 m² |
| Project cost | ₹5 lakh |
| Village / locality | Tambas |
| Taluk / tehsil | Karjat |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15699 |
In context
674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.1 acres, this one is smaller than 99% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tambas, Karjat, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected Forest Land for Construction of Approach Road including… — initial checks, 150 m away
- Diversion of Forest Land for Laying of Underground Ofc Duct & Cable Within Row… — lapsed, 3.6 km away
- Aadarsh Public Charitable Trust's, Sundar English Medium School has submitted… — initial checks, 4 km away
- The Diversion Of 0.1601 Ha. Protected Forest Land — under forest review, 4.3 km away
- Saidongar-1 Karjat (3000 MW) Off-stream Open Loop Pumped Storage Project — under forest review, 5.7 km away
- Saidongar-1 Karjat (3000 MW) Off-stream Open Loop Pumped Storage Project — forest land use approved, 5.7 km away
- Stone quarry proposal of Mr. Vijay Bahadur Jaikaran Singh over an extent of… — environmental approval granted, 6.1 km away
- Stone quarry proposal of Sou. Aruna Santosh Bhoir, over an extent of area 2.32… — environmental approval granted, 6.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.