Quick answers
What is this project?
Providing, Lowering, Laying and Commissioning of Pipeline Below Patalganga Riverbed at Kharpada Under Hetewane Water Supply Scheme in Raigad, Maharashtra is a lapsed pipeline project in Kasar Bhat, Panvel, Raigarh, Maharashtra. The site covers 3.1 acres.
Who is building it?
The applicant is City and Industrial Development Corporation of Maharashtra Limited.
Has it been approved?
No. The application was lapsed on 20 Jul 2025, so it is no longer under consideration.
Where is it?
In Kasar Bhat, Panvel, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹10.8 crore; a site of 3.1 acres and 1.1 acres (0.4 ha) of forest land.
When was it filed?
The application was filed on 10 Jun 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Providing, Lowering, Laying and Commissioning of Pipeline Below Patalganga Riverbed at…
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Jul 2025 |
| Application filed | 10 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | City and Industrial Development Corporation of Maharashtra Limited |
| Land area | 3.1 acres (1.3 ha) |
| Forest land | 1.1 acres (0.4 ha) |
| Project cost | ₹10.8 crore |
| Village / locality | Kasar Bhat |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site area on record |
| Our reference | WID-MH-14476 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Jun 2025 | Lapsed | 3.1 acres | ₹10.8 crore |
| New project filed 10 Jun 2025 (this page) | Lapsed | 3.1 acres | ₹10.8 crore |
In context
19 applications in Raigarh since January 2022 are in the same category (Pipelines): 4 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. At 3.1 acres, this one is smaller than 69% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kasar Bhat, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Providing, Lowering, Laying and Commissioning of Pipeline Below Patalganga… — lapsed, 0 m away
- 3.35 Km Long Treated Water Tunnel and Allied Works From Shaft 1 Near Wtp — coastal clearance granted, 1.3 km away
- Environmental Clerance for the Basalt stone quarry of Shri. Suresh Namdev… — environmental approval granted, 2.1 km away
- Environmental Clerance for the Basalt Stone Quarry of Shri. Gajanan Namdev… — environmental approval granted, 2.2 km away
- Diversion of Restored Private Forest Land (Restored Before 25/10/1980) for… — lapsed, 3.1 km away
- Environmental Clearance for Basalt Stone Quarry of M/S. Thakur Infra Projects… — environmental approval granted, 4.3 km away
- Environmental Clearance for the Basalt stone quarry of M/s. Thakur Infra Pvt.… — withdrawn, 4.3 km away
- Environmental Clearance for the Basalt stone quarry of M/s. Thakur Infra Pvt.… — lapsed, 4.3 km away
More from City and Industrial Development Corporation of Maharashtra Limited in Raigarh
- Diversion of Forest land for proposed construction of Kondhane Dam in Karjat… — more information requested
- Integrated Infrastructure Works of Roads (Stage-I), S.W. Drain, Footpath,… — lapsed
- Integrated Infrastructure Works of Roads (Stage-I), S.W. Drain, Footpath,… — returned to applicant
- Integrated Infrastructure Facilities Like Roads (1st Stage), S.W. Drainage… — recommended by coastal authority
- Roads and Channels on Forest land for Town Planning Scheme (TPS 2 to TPS 12)… — lapsed
- Development of land for International Education City — lapsed
27 City and Industrial Development Corporation of Maharashtra projects in Raigarh
All 34 City and Industrial Development Corporation of Maharashtra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.