Quick answers
What is this project?
Diversion of Forest area for proposed Raw Water Tunnel (RWT) from Hetawane Dam to Water Treatment Plant is a proposed water and irrigation project in Ambeghar, Pen, Raigarh, Maharashtra. The site covers 33.3 acres.
Who is building it?
The applicant is City and Industrial Development Corporation of Maharashtra Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Ambeghar, Pen, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹1,042.3 crore; a site of 33.3 acres and 4.3 acres (1.7 ha) of forest land.
When was it filed?
The application was filed on 23 Sept 2024.
Project details
| Official title | Diversion of Forest area for proposed Raw Water Tunnel (RWT) from Hetawane Dam to Water Treatment Plant at Jite village, Pen Taluka, Raigad district in the State of Maharashtra |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 8 Sept 2025 |
| Application filed | 23 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | City and Industrial Development Corporation of Maharashtra Limited |
| Land area | 33.3 acres (13.5 ha) |
| Forest land | 4.3 acres (1.7 ha) |
| Project cost | ₹1,042.3 crore |
| Village / locality | Ambeghar |
| Taluk / tehsil | Pen |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14614 |
In context
31 applications in Raigarh since January 2022 are in the same category (Water & irrigation): 11 approved, 14 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 33.3 acres, this one is smaller than 87% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ambeghar, Pen, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Darshan Kirtikumar Bafna — environmental approval granted, 1000 m away
- Environmental Clearance for the Basalt stone quarry of Shri. Darshan… — lapsed, 1000 m away
- Environmental Clearance for the Stone Quarry of Shri. Darshan Kirtikumar… — environmental approval granted, 1.8 km away
- Environmental Clearance for the stone quarry of Shri. Kelvin Singh Kohli &… — environmental approval granted, 2 km away
- Approached Road Along With Electricity Line and Water Pipe Line to the Private… — forest land use approved, 2.3 km away
- Reappraisal of Environmental Clearance for proposed Basalt stone quarry… — environmental approval granted, 2.5 km away
- Environmental Clearance for the Basalt Stone Quarry having area 2.49 Ha of… — environmental approval granted, 2.6 km away
- Environmental Clearance for the Basalt Stone Quarry of Shri. Ramakant… — lapsed, 2.6 km away
More from City and Industrial Development Corporation of Maharashtra Limited in Raigarh
- Diversion of Forest land for proposed construction of Kondhane Dam in Karjat… — more information requested
- Integrated Infrastructure Works of Roads (Stage-I), S.W. Drain, Footpath,… — lapsed
- Integrated Infrastructure Works of Roads (Stage-I), S.W. Drain, Footpath,… — returned to applicant
- Integrated Infrastructure Facilities Like Roads (1st Stage), S.W. Drainage… — recommended by coastal authority
- Roads and Channels on Forest land for Town Planning Scheme (TPS 2 to TPS 12)… — lapsed
- Development of land for International Education City — lapsed
27 City and Industrial Development Corporation of Maharashtra projects in Raigarh
All 34 City and Industrial Development Corporation of Maharashtra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.