One of 2 filings for this project. The project's main page, with every filing and where each stands: Laying of Pipeline for Drinking Water Supply
Project details
| Official title | Laying of Pipeline for Drinking Water Supply in Dhahigoan Bodan Village and Otherpadas in Thane District Through Jal Jeevan Mission Scheme |
|---|---|
| Status | Lapsed |
| Status since | 11 Jan 2026 |
| Application filed | 3 Aug 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Buildings & townships |
| Applicant | Niket Jadhav |
| Land area | 5.7 acres (2.3 ha) |
| Forest land | 4.1 acres (1.7 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Dahigaon |
| Taluk / tehsil | Shahapur |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14672 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 3 Aug 2023 (this page) | Lapsed | 5.7 acres | ₹2.1 crore |
| New project filed 25 Jul 2023 | More information requested | 5.7 acres | ₹2.1 crore |
In context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.7 acres, this one is larger than 56% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dahigaon, Shahapur, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Pipeline for Drinking Water Supply — more information requested, 0 m away
- Laying of Pipeline for Drinking Water Supply — more information requested, 4.5 km away
- Laying of Pipeline for Drinking Water Supply — lapsed, 4.6 km away
- Laying of Pipeline for Drinking Water Supply — lapsed, 7.8 km away
- Laying of Pipeline for Drinking Water Supply — more information requested, 7.8 km away
- Laying of Pipeline for Drinking Water Supply — more information requested, 12.9 km away
- Re-diversion of 4.90 ha. Reserved forest land for construction of Hydro Power… — forest land use approved, 16.1 km away
- Wildlife Clearance From Sbwl /Nbwl for Diversion of Forest Land & Non-Forest… — more information requested, 17.1 km away
More from Niket Jadhav in Thane
- Laying of Pipeline for Drinking Water Supply — lapsed
- Laying of Pipeline for Drinking Water Supply — lapsed
- Laying of Pipeline for Drinking Water Supply — under wildlife review
- Laying of Pipeline for Drinking Water Supply — more information requested
- Laying of Pipeline for Drinking Water Supply — more information requested
- Laying of Pipeline for Drinking Water Supply — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.