Project details
| Official title | Proposal for Wildlife Clearance From Sbwl /Nbwl for Diversion of Forest Land & Non-Forest Land Within Esz (10 Km) of Tanasa Wildlife Sanctuary Area Required for Construction of 220 KV. Transmission Line /Lilo on 220 KV Nashik Ocr -Padghe Tr. Line to Proposed 220KV. Sub-Station at Middal Vaitarna Dam. Tr. Line Passing Through Villages Dapur, Mal, Vihigaon, Tal. Shahapur, Dist. Thane. |
|---|---|
| Status | More information requested |
| Status since | 4 Dec 2025 |
| Application filed | 4 Dec 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Rakesh P. Kapadnis |
| Land area | 1,302.9 acres (527.3 ha) |
| Project cost | ₹13 crore |
| Village / locality | Mal |
| Taluk / tehsil | Shahapur |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16659 |
In context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,302.9 acres, this one is larger than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mal, Shahapur, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 11.4674 Ha. Reserved Forest, Protected Forest land for Lilo on… — more information requested, 1.9 km away
- Re-diversion of 4.90 ha. Reserved forest land for construction of Hydro Power… — forest land use approved, 2.3 km away
- Regional Rural Water Grid Scheme for 97 Villages in Shahapur Taluka, Dist.… — initial checks, 7.4 km away
- Laying of Pipeline for Drinking Water Supply — lapsed, 17.1 km away
- Laying of Pipeline for Drinking Water Supply — more information requested, 17.1 km away
- Laying of Pipeline for Drinking Water Supply — more information requested, 20.2 km away
- Laying of Pipeline for Drinking Water Supply — lapsed, 20.3 km away
- New Road alignment — lapsed, 23 km away
More from Rakesh P. Kapadnis in Thane
- Proposed Construction of New Pickup Weir at Pise Village, Bhiwandi Taluka,… — coastal clearance granted
- Diversion of 11.4674 Ha. Reserved Forest, Protected Forest land for Lilo on… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.