Project details
| Status | Forest land use approved |
|---|---|
| Status since | 25 Jul 2025 |
| Application filed | 16 Feb 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Water & irrigation |
| Applicant | Brihanmumbai Municipal Corporation |
| Land area | 12.1 acres (4.9 ha) |
| Forest land | 12.1 acres (4.9 ha) |
| Project cost | ₹500 crore |
| Village / locality | Shirol |
| Taluk / tehsil | Shahapur |
| District | Thane |
| State | Maharashtra |
| Location from | Site area on record |
| Our reference | WID-MH-15000 |
In context
15 applications in Thane since January 2022 are in the same category (Water & irrigation): 5 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 12.1 acres, this one is smaller than 80% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shirol, Shahapur, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Wildlife Clearance From Sbwl /Nbwl for Diversion of Forest Land & Non-Forest… — more information requested, 2.3 km away
- Diversion of 11.4674 Ha. Reserved Forest, Protected Forest land for Lilo on… — more information requested, 3.1 km away
- Regional Rural Water Grid Scheme for 97 Villages in Shahapur Taluka, Dist.… — initial checks, 7.3 km away
- Laying of Pipeline for Drinking Water Supply — lapsed, 16.1 km away
- Laying of Pipeline for Drinking Water Supply — more information requested, 16.1 km away
- Laying of Pipeline for Drinking Water Supply — more information requested, 19.6 km away
- Laying of Pipeline for Drinking Water Supply — lapsed, 19.7 km away
- New Road alignment — lapsed, 20.7 km away
More from Brihanmumbai Municipal Corporation in Thane
- Design and construction of Tunnel from Yewai Master Balancing Reservoir to… — in-principle approval, conditions pending
- Design and construction of Tunnel from Yewai Master Balancing Reservoir to… — coastal clearance granted
5 Brihanmumbai Municipal Corporation projects in Thane
All 59 Brihanmumbai Municipal Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.