In-principle approval, conditions pendingRoads & highways · Satara, Maharashtra

Diversion of Forest Land for Construction of Existing Kacha Road to Metal/Tar Road Rewalkarwadi to Temple in Rameshwer Tal. Khatav, As Approach Road to Wind Power Project on Lease Forest Land and Private Land, and Also Approach to to Rameshwar Temple. and Privates Land Land Owners of Land Surrounded by Forest Land . Approach Road Passing Through Forest Land at Rewalkarwadi & Rameshwar , Tal. Khatav , Dist. Satara.

Diversion of Forest Land for Construction of Existing Kacha Road to Metal/Tar Road Rewalkarwadi to Temple in Rameshwer Tal. Khatav, As Approach Road to Wind Power Project on Lease Forest Land and Private Land, and Also Approach to to Rameshwar Temple. and Privates Land Land Owners of Land Surrounded by Forest Land . Approach Road Passing Through Forest Land at Rewalkarwadi & Rameshwar , Tal. Khatav , Dist. Satara is a proposed road project in Rameshwar, Khatav, Satara, Maharashtra. The site covers 2.6 acres. Its stated project cost is ₹1.2 crore. As of 27 Nov 2026, its status is “In-principle approval, conditions pending” (since 2 Sept 2026).

See it on the live map All projects in Satara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of Forest Land for Construction of Existing Kacha Road to Metal/Tar Road Rewalkarwadi to Temple in Rameshwer Tal. Khatav, As Approach Road to Wind Power Project on Lease Forest Land and Private Land, and Also Approach to to Rameshwar Temple. and Privates Land Land Owners of Land Surrounded by Forest Land . Approach Road Passing Through Forest Land at Rewalkarwadi & Rameshwar , Tal. Khatav , Dist. Satara is a proposed road project in Rameshwar, Khatav, Satara, Maharashtra. The site covers 2.6 acres.

Who is building it?

The applicant is Vinayak Chalke.

Has it been approved?

Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.

Where is it?

In Rameshwar, Khatav, Satara, Maharashtra.

How big is it?

It has a stated cost of ₹1.2 crore; a site of 2.6 acres and 1.8 acres (0.7 ha) of forest land.

When was it filed?

The application was filed on 1 Jun 2023.

Project details

StatusIn-principle approval, conditions pending
Status since2 Sept 2026
Application filed1 Jun 2023
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantVinayak Chalke
Land area2.6 acres (1 ha)
Forest land1.8 acres (0.7 ha)
Project cost₹1.2 crore
Village / localityRameshwar
Taluk / tehsilKhatav
DistrictSatara
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-14754

In context

27 applications in Satara since January 2022 are in the same category (Roads & highways): 1 approved, 22 filed or under review, and 4 withdrawn, lapsed or rejected. At 2.6 acres, this one is larger than 58% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Rameshwar, Khatav, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.