What is this project?
Proposal of diversion of forest land at proposed Loc.No.07 of construction of 132 KV SC/DC transmission line from 132 KV Aundh to 132 KV Ambheri Sub-station is a proposed building project in Ambheri, Koregaon, Satara, Maharashtra. The site covers 3.5 acres.
Who is building it?
The applicant is Maharashtra State Electricity Transmission Company Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Ambheri, Koregaon, Satara, Maharashtra.
How big is it?
It has a stated cost of ₹31 lakh; a site of 3.5 acres and 1.7 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 10 Jan 2024.
Project details
| Official title | Proposal of diversion of forest land at proposed Loc.No.07 of construction of 132 KV SC/DC transmission line from 132 KV Aundh to 132 KV Ambheri Sub-station at Village Ambheri, Gat No.346, Survey No.115, Compartment No.216, Tal. Koregaon, Dist. Satara |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 29 Oct 2024 |
| Application filed | 10 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Maharashtra State Electricity Transmission Company Limited |
| Use | Other |
| Land area | 3.5 acres (1.4 ha) |
| Forest land | 1.7 acres (0.7 ha) |
| Plot area | 6,800 m² (73,195 sq ft) |
| Project cost | ₹31 lakh |
| Village / locality | Ambheri |
| Taluk / tehsil | Koregaon |
| District | Satara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16212 |
In context
52 applications in Satara since January 2022 are in the same category (Buildings & townships): 20 approved, 23 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 3.5 acres, this one is smaller than 83% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ambheri, Koregaon, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land at Proposed Location No.07 of Construction of 132KV… — lapsed, 50 m away
- Environmental Clearance for the Stone Quarry of Shri. Amit Ravindra Ithape &… — environmental approval granted, 3 km away
- Shri. Jitendra Bajirao Pawar — environmental approval granted, 3.4 km away
- Environmental Clearance for Basalt Stone Quarry having area 2.00 Ha of Shri.… — environmental approval granted, 5 km away
- Amendment in the existing EC 10000 TCD, new 60 MW Co-gen & 200 KLPD Molasses… — environmental approval granted, 5.3 km away
- Diversion of Forest Land for Construction of Existing Kacha Road to Metal/Tar… — in-principle approval, conditions pending, 6 km away
- Environmental Clearance for the Basalt stone quarry of Shri. Sagar Hanmant… — environmental approval granted, 6.8 km away
- Diversion of Forest Land for Laying Optical Fiber Cable Within Row of the… — lapsed, 6.9 km away
More from Maharashtra State Electricity Transmission Company Limited in Satara
All 4 Maharashtra State Electricity projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.