What is this project?
Re-Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for Laying Underground Optical Fiber Cable along the Road from Ranipur to Rapapur in Taluka-Taloda, Dist-Nandurbar in the State of Maharashtra is an approved telecom project in Kothar, Talode, Nandurbar, Maharashtra. The site covers 1.1 acres.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 14 Aug 2026), as of 27 Nov 2026.
Where is it?
In Kothar, Talode, Nandurbar, Maharashtra.
How big is it?
It has a stated cost of ₹10 lakh; a site of 1.1 acres and 1.1 acres (0.4 ha) of forest land.
When was it filed?
The application was filed on 19 Jun 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 14 Aug 2026 |
| Application filed | 19 Jun 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 1.1 acres (0.4 ha) |
| Forest land | 1.1 acres (0.4 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Kothar |
| Taluk / tehsil | Talode |
| District | Nandurbar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14821 |
In context
12 applications in Nandurbar since January 2022 are in the same category (Telecom): 1 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kothar, Talode, Nandurbar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for… — lapsed, 2.1 km away
- Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for Laying… — lapsed, 2.1 km away
- Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for Laying… — lapsed, 2.1 km away
- Diversion of 0.23875 Ha. of Forest Land at Mewasi Forest Division for Laying… — lapsed, 2.7 km away
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — lapsed, 14.4 km away
- Proposed 5 KLPD Mahua Flower-Based Distillery for Manufacturing of Potable… — environmental approval granted, 16.7 km away
- Proposed 5 KLPD Mahua Flower-Based Distillery for Manufacturing of Potable… — cleared for impact study, 16.7 km away
- Mahua Distillery unit — cleared for impact study, 16.7 km away
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.